{"id":{"repo_id":"mit","oai_identifier":"oai:dspace.mit.edu:1721.1/46483"},"canonical_url":"https://search.dev.ndltd.org/etd/mit/oai:dspace.mit.edu:1721.1/46483","repository":{"repo_id":"mit","name":"MIT","base_url":"https://dspace.mit.edu/oai/request"},"display":{"title":"Operational improvements in a factory of low volume and high mixture","abstract":"This thesis shows operational improvements for the assembly area of a semiconductor equipment manufacturer. High complexity and customization of machines and a low and fluctuating volume are typical challenges within the company. The aim of the research is to improve key metrics for operational improvements. These include lead time reduction, inventory management, floor space efficiency, testing operations, cross-training of operators, and volume flexibility. The current state of the manufacturing system is recorded. Driving principles for new floor layouts are identified in the areas of testing operations, subassembly build and inventory, and module build and inventory. Combinations of the principles lead to three different floor layout proposals. The first layout puts the assembly of modules close to test equipment to reduce movement effort. The second layout has consolidated inventory for each build area and allows a better management of inventory and higher space utilization. The third layout consolidates all inventories of the factory into one area and uses completely generic space for the build. This increases flexibility of both work force and space. A pilot layout is generated using a blend of these three layouts, and operational aspects of the pilot layout are examined. These aspects consider management of inventory, assembly tools, and time studies for the assembly operations, showing that the pilot can be implemented and performs better than the current operations. Key Words: Improvement, Factory, Operations, Low Volume, High Mixture, Inventory, Material, Handling, Test Equipment,","abstract_html":"This thesis shows operational improvements for the assembly area of a semiconductor equipment manufacturer. High complexity and customization of machines and a low and fluctuating volume are typical challenges within the company. The aim of the research is to improve key metrics for operational improvements. These include lead time reduction, inventory management, floor space efficiency, testing operations, cross-training of operators, and volume flexibility. The current state of the manufacturing system is recorded. Driving principles for new floor layouts are identified in the areas of testing operations, subassembly build and inventory, and module build and inventory. Combinations of the principles lead to three different floor layout proposals. The first layout puts the assembly of modules close to test equipment to reduce movement effort. The second layout has consolidated inventory for each build area and allows a better management of inventory and higher space utilization. The third layout consolidates all inventories of the factory into one area and uses completely generic space for the build. This increases flexibility of both work force and space. A pilot layout is generated using a blend of these three layouts, and operational aspects of the pilot layout are examined. These aspects consider management of inventory, assembly tools, and time studies for the assembly operations, showing that the pilot can be implemented and performs better than the current operations. Key Words: Improvement, Factory, Operations, Low Volume, High Mixture, Inventory, Material, Handling, Test Equipment,","abstract_has_math":false,"creators":["Treis, Simon Michael Christian"],"institution":"Massachusetts Institute of Technology","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":"Massachusetts Institute of Technology. Dept. of Mechanical Engineering.","school":null,"contributors":[],"advisors":["Duane S. Boning."],"committee_chairs":[],"committee_members":[],"year":2008,"date_issued":"2008","date_published":"2008","updated_at":"2026-07-22T22:22:17Z","subjects":["Mechanical Engineering."],"languages":["eng"],"rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"rights_urls":["http://dspace.mit.edu/handle/1721.1/7582"],"identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/1721.1/46483","outbound_label":"Handle","outbound_source":"dc:identifier.uri"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Duane S. Boning."]},{"key":"dc:contributor.department","label":"Department","values":["Massachusetts Institute of Technology. Dept. of Mechanical Engineering."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Massachusetts Institute of Technology. Dept. of Mechanical Engineering."]},{"key":"dc:creator","label":"Author","values":["Treis, Simon Michael Christian"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2009-08-26T16:32:49Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2009-08-26T16:32:49Z"]},{"key":"dc:date.issued","label":"Date","values":["2008"]},{"key":"dc:publisher","label":"Institution","values":["Massachusetts Institute of Technology"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Mechanical Engineering."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["eng"]},{"key":"dc:rights","label":"Dc Rights","values":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://dspace.mit.edu/handle/1721.1/7582"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1721.1/46483"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2008.","Includes bibliographical references (p. 126)."]},{"key":"dc:description.abstract","label":"Abstract","values":["This thesis shows operational improvements for the assembly area of a semiconductor equipment manufacturer. High complexity and customization of machines and a low and fluctuating volume are typical challenges within the company. The aim of the research is to improve key metrics for operational improvements. These include lead time reduction, inventory management, floor space efficiency, testing operations, cross-training of operators, and volume flexibility. The current state of the manufacturing system is recorded. Driving principles for new floor layouts are identified in the areas of testing operations, subassembly build and inventory, and module build and inventory. Combinations of the principles lead to three different floor layout proposals. The first layout puts the assembly of modules close to test equipment to reduce movement effort. The second layout has consolidated inventory for each build area and allows a better management of inventory and higher space utilization. The third layout consolidates all inventories of the factory into one area and uses completely generic space for the build. This increases flexibility of both work force and space. A pilot layout is generated using a blend of these three layouts, and operational aspects of the pilot layout are examined. These aspects consider management of inventory, assembly tools, and time studies for the assembly operations, showing that the pilot can be implemented and performs better than the current operations. Key Words: Improvement, Factory, Operations, Low Volume, High Mixture, Inventory, Material, Handling, Test Equipment,"]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["M.Eng."]},{"key":"dc:title","label":"Title","values":["Operational improvements in a factory of low volume and high mixture"]}]}],"canonical_facts":{"dc:contributor.advisor":["Duane S. Boning."],"dc:contributor.department":["Massachusetts Institute of Technology. Dept. of Mechanical Engineering."],"dc:contributor.other":["Massachusetts Institute of Technology. Dept. of Mechanical Engineering."],"dc:creator":["Treis, Simon Michael Christian"],"dc:date.accessioned":["2009-08-26T16:32:49Z"],"dc:date.available":["2009-08-26T16:32:49Z"],"dc:date.issued":["2008"],"dc:description":["Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2008.","Includes bibliographical references (p. 126)."],"dc:description.abstract":["This thesis shows operational improvements for the assembly area of a semiconductor equipment manufacturer. High complexity and customization of machines and a low and fluctuating volume are typical challenges within the company. The aim of the research is to improve key metrics for operational improvements. These include lead time reduction, inventory management, floor space efficiency, testing operations, cross-training of operators, and volume flexibility. The current state of the manufacturing system is recorded. Driving principles for new floor layouts are identified in the areas of testing operations, subassembly build and inventory, and module build and inventory. Combinations of the principles lead to three different floor layout proposals. The first layout puts the assembly of modules close to test equipment to reduce movement effort. The second layout has consolidated inventory for each build area and allows a better management of inventory and higher space utilization. The third layout consolidates all inventories of the factory into one area and uses completely generic space for the build. This increases flexibility of both work force and space. A pilot layout is generated using a blend of these three layouts, and operational aspects of the pilot layout are examined. These aspects consider management of inventory, assembly tools, and time studies for the assembly operations, showing that the pilot can be implemented and performs better than the current operations. Key Words: Improvement, Factory, Operations, Low Volume, High Mixture, Inventory, Material, Handling, Test Equipment,"],"dc:description.degree":["M.Eng."],"dc:identifier.uri":["http://hdl.handle.net/1721.1/46483"],"dc:language.iso":["eng"],"dc:publisher":["Massachusetts Institute of Technology"],"dc:rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"dc:rights.uri":["http://dspace.mit.edu/handle/1721.1/7582"],"dc:subject":["Mechanical Engineering."],"dc:title":["Operational improvements in a factory of low volume and high mixture"],"dc:type":["Thesis"]},"updated_at":"2026-07-22T22:22:17Z"}