Back to results

Massachusetts Institute of Technology

Multiple-part-type production scheduling for high volume manufacturing (token-based approach)

Abstract

dc:description.abstract

Multiple-part-type production scheduling is a common industrial problem with no generalized solution. In this thesis, a systematic approach is presented to aid in the mentioned production decision making in an actual factory. This strategy involves first generating production targets by optimization followed by a real-time scheduling (token-based) method --- the Control Point Policy. Based on the simulation results, the proposed strategy is able to schedule the production effectively. In addition, it was demonstrated that there was a tradeoff between the amount of inventory and the number of changeovers. Keywords: Multiple-part-type, production scheduling, optimization, token-based Disclaimer: The content of the thesis is modified to protect the real identity of the attachment company. Company name and confidential information are omitted.

Degree

thesis:*
Department dc:contributor.department
Massachusetts Institute of Technology. Dept. of Mechanical Engineering.
Grantor dc:publisher
Massachusetts Institute of Technology
Year dc:date.issued
2008

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Ng, Sing Hng
Advisor dc:contributor.advisor
  • Stanley B. Gershwin.

Subjects

dc:subject × 1

Rights

dc:rights
Statement dc:rights
  • M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/1721.1/46160
OAI identifier oai:identifier
oai:dspace.mit.edu:1721.1/46160

Chain of custody

source
Harvested from
MIT
Base URL
dspace.mit.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Ng, Sing Hng. Multiple-part-type production scheduling for high volume manufacturing (token-based approach). Massachusetts Institute of Technology, 2008. http://hdl.handle.net/1721.1/46160