Back to results

Massachusetts Institute of Technology

IBC management : an application of WIP control for a pharmaceutical company

Abstract

dc:description.abstract

An Intermediate Bulk Container (IBC) is used to contain raw materials and semi-products in pharmaceutical company ABC. Due to the high price of an IBC, company ABC sought to minimize the number of IBCs needed to support the production of four separate products. In this project, we identify five IBCs drivers that affect or determine the number of IBCs required. The cleaning schedule for IBCs was modified to reuse IBCs as much as possible. In this paper, we analyze the management of I 800L IBCs. Three of the five IBC drivers were analyzed in detail. Integer programming model, deterministic simulation method and Buzacott's formula for zero buffer line were used to solve the problems associated with the three IBC drivers to minimize the required number of the 1 800L IBCs. Cleaning schedule for 1800L IBCs was modified under two production scenarios to reuse 1800L IBCs as much as possible.

Degree

thesis:*
Department dc:contributor.department
Massachusetts Institute of Technology. Dept. of Mechanical Engineering.
Grantor dc:publisher
Massachusetts Institute of Technology
Year dc:date.issued
2008

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Hu. He, M. Eng. Massachusetts Institute of Technology
Advisor dc:contributor.advisor
  • Stephen C. Graves.

Subjects

dc:subject × 1

Rights

dc:rights
Statement dc:rights
  • M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/1721.1/46154
OAI identifier oai:identifier
oai:dspace.mit.edu:1721.1/46154

Chain of custody

source
Harvested from
MIT
Base URL
dspace.mit.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Hu. He, M. Eng. Massachusetts Institute of Technology. IBC management : an application of WIP control for a pharmaceutical company. Massachusetts Institute of Technology, 2008. http://hdl.handle.net/1721.1/46154