{"id":{"repo_id":"mit","oai_identifier":"oai:dspace.mit.edu:1721.1/44876"},"canonical_url":"https://search.dev.ndltd.org/etd/mit/oai:dspace.mit.edu:1721.1/44876","repository":{"repo_id":"mit","name":"MIT","base_url":"https://dspace.mit.edu/oai/request"},"display":{"title":"Updating MIT's cost estimation model for shipbuilding","abstract":"This thesis project will update the MIT ship cost estimation model by combining the two existing models (the Basic Military Training School (BMTS) Cost Model and the MIT Math Model) in order to develop a program that can accurately determine both a ship's acquisition cost as well as its life cycle cost. Using United States Coast Guard resources, this project will also address various aspects of the ship design process which have a direct effect on the cost of building a ship. This will include, but not be limited to, the cost estimation process, determining which design decisions have the biggest impact on the ship's total cost, common pitfalls in the design process that lead to increases in cost, and lessons learned that have helped minimize the cost of a ship.","abstract_html":"This thesis project will update the MIT ship cost estimation model by combining the two existing models (the Basic Military Training School (BMTS) Cost Model and the MIT Math Model) in order to develop a program that can accurately determine both a ship&#x27;s acquisition cost as well as its life cycle cost. Using United States Coast Guard resources, this project will also address various aspects of the ship design process which have a direct effect on the cost of building a ship. This will include, but not be limited to, the cost estimation process, determining which design decisions have the biggest impact on the ship&#x27;s total cost, common pitfalls in the design process that lead to increases in cost, and lessons learned that have helped minimize the cost of a ship.","abstract_has_math":false,"creators":["Smith, Matthew B., Lieutenant, junior grade"],"institution":"Massachusetts Institute of Technology","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":"Massachusetts Institute of Technology. Dept. of Mechanical Engineering.","school":null,"contributors":[],"advisors":["Joel Harbour."],"committee_chairs":[],"committee_members":[],"year":2008,"date_issued":"2008","date_published":"2008","updated_at":"2026-07-22T22:21:39Z","subjects":["Mechanical Engineering."],"languages":["eng"],"rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"rights_urls":["http://dspace.mit.edu/handle/1721.1/7582"],"identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/1721.1/44876","outbound_label":"Handle","outbound_source":"dc:identifier.uri"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Joel Harbour."]},{"key":"dc:contributor.department","label":"Department","values":["Massachusetts Institute of Technology. Dept. of Mechanical Engineering."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Massachusetts Institute of Technology. Dept. of Mechanical Engineering."]},{"key":"dc:creator","label":"Author","values":["Smith, Matthew B., Lieutenant, junior grade"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2009-03-16T19:54:41Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2009-03-16T19:54:41Z"]},{"key":"dc:date.issued","label":"Date","values":["2008"]},{"key":"dc:publisher","label":"Institution","values":["Massachusetts Institute of Technology"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Mechanical Engineering."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["eng"]},{"key":"dc:rights","label":"Dc Rights","values":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://dspace.mit.edu/handle/1721.1/7582"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1721.1/44876"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["Thesis (S.M. in Naval Architecture and Marine Engineering)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2008.","\"LTJG Matthew B. Smith, USCG.\"","Includes bibliographical references (leaf 82)."]},{"key":"dc:description.abstract","label":"Abstract","values":["This thesis project will update the MIT ship cost estimation model by combining the two existing models (the Basic Military Training School (BMTS) Cost Model and the MIT Math Model) in order to develop a program that can accurately determine both a ship's acquisition cost as well as its life cycle cost. Using United States Coast Guard resources, this project will also address various aspects of the ship design process which have a direct effect on the cost of building a ship. This will include, but not be limited to, the cost estimation process, determining which design decisions have the biggest impact on the ship's total cost, common pitfalls in the design process that lead to increases in cost, and lessons learned that have helped minimize the cost of a ship."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["S.M.in Naval Architecture and Marine Engineering"]},{"key":"dc:title","label":"Title","values":["Updating MIT's cost estimation model for shipbuilding"]}]}],"canonical_facts":{"dc:contributor.advisor":["Joel Harbour."],"dc:contributor.department":["Massachusetts Institute of Technology. Dept. of Mechanical Engineering."],"dc:contributor.other":["Massachusetts Institute of Technology. Dept. of Mechanical Engineering."],"dc:creator":["Smith, Matthew B., Lieutenant, junior grade"],"dc:date.accessioned":["2009-03-16T19:54:41Z"],"dc:date.available":["2009-03-16T19:54:41Z"],"dc:date.issued":["2008"],"dc:description":["Thesis (S.M. in Naval Architecture and Marine Engineering)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2008.","\"LTJG Matthew B. Smith, USCG.\"","Includes bibliographical references (leaf 82)."],"dc:description.abstract":["This thesis project will update the MIT ship cost estimation model by combining the two existing models (the Basic Military Training School (BMTS) Cost Model and the MIT Math Model) in order to develop a program that can accurately determine both a ship's acquisition cost as well as its life cycle cost. Using United States Coast Guard resources, this project will also address various aspects of the ship design process which have a direct effect on the cost of building a ship. This will include, but not be limited to, the cost estimation process, determining which design decisions have the biggest impact on the ship's total cost, common pitfalls in the design process that lead to increases in cost, and lessons learned that have helped minimize the cost of a ship."],"dc:description.degree":["S.M.in Naval Architecture and Marine Engineering"],"dc:identifier.uri":["http://hdl.handle.net/1721.1/44876"],"dc:language.iso":["eng"],"dc:publisher":["Massachusetts Institute of Technology"],"dc:rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"dc:rights.uri":["http://dspace.mit.edu/handle/1721.1/7582"],"dc:subject":["Mechanical Engineering."],"dc:title":["Updating MIT's cost estimation model for shipbuilding"],"dc:type":["Thesis"]},"updated_at":"2026-07-22T22:21:39Z"}