Back to results

Massachusetts Institute of Technology

Level schedule implementation in unstable manufacturing environments

Abstract

dc:description.abstract

American Axle & Manufacturing Inc. (AAM), headquartered in Detroit (MI) is one of the major Tier 1 suppliers in the automotive industry. The main challenge in AAM plant 2 is production rate unstability due to downtime, quality, changeover and absenteeism issues. The company is currently making a major effort to reduce this unstability. This thesis describes some of the systems which have been implemented in order to improve the inventory management policy in this factory. The document is structured around three main topics: research on the operations and materials management policy in Plant 2, design of new lean management systems ( level scheduling and visual management) and design of new Operations Research-based production planning tools to coordinate multiple mixed model production lines in an unstable manufacturing environment. Special emphasis is placed on the role of execution for true improvement and the challenges faced by the implementation team in this initiative.

Degree

thesis:*
Department dc:contributor.department
Leaders for Manufacturing Program at MIT
Grantor dc:publisher
Massachusetts Institute of Technology
Year dc:date.issued
2008

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • López de Haro, Santiago
Advisor dc:contributor.advisor
  • Donald Rosenfield and Stanley Gershwin.

Subjects

dc:subject × 3

Rights

dc:rights
Statement dc:rights
  • M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/1721.1/44453
OAI identifier oai:identifier
oai:dspace.mit.edu:1721.1/44453

Chain of custody

source
Harvested from
MIT
Base URL
dspace.mit.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

López de Haro, Santiago. Level schedule implementation in unstable manufacturing environments. Massachusetts Institute of Technology, 2008. http://hdl.handle.net/1721.1/44453