{"id":{"repo_id":"mit","oai_identifier":"oai:dspace.mit.edu:1721.1/43861"},"canonical_url":"https://search.dev.ndltd.org/etd/mit/oai:dspace.mit.edu:1721.1/43861","repository":{"repo_id":"mit","name":"MIT","base_url":"https://dspace.mit.edu/oai/request"},"display":{"title":"Analysis of the effect of planning/design phase factors on rework","abstract":"Over the past several years, Raytheon has experienced great growth in their revenue and sales. One of the contributing organizations to that growth has been the Space and Airborne Systems (SAS) business sector. To continue this growth, SAS has started initiatives to improve their Operations. One of these initiatives is to reduce the amount of rework performed within the manufacturing centers. By reducing rework, SAS will be able to reduce costs, meet aggressive schedules, and continue to satisfy customer's needs. This paper describes the development of two tools to reduce rework in an attempt to meet Raytheon's goals. One is a manufacturing/Earned-Value Measurement System monitoring tool. The second tool determines the factors during the design and planning phases of a project that affect rework. Developing these two tools will help increase transparency on the manufacturing shop floor and help reduce the amount of rework performed.","abstract_html":"Over the past several years, Raytheon has experienced great growth in their revenue and sales. One of the contributing organizations to that growth has been the Space and Airborne Systems (SAS) business sector. To continue this growth, SAS has started initiatives to improve their Operations. One of these initiatives is to reduce the amount of rework performed within the manufacturing centers. By reducing rework, SAS will be able to reduce costs, meet aggressive schedules, and continue to satisfy customer&#x27;s needs. This paper describes the development of two tools to reduce rework in an attempt to meet Raytheon&#x27;s goals. One is a manufacturing/Earned-Value Measurement System monitoring tool. The second tool determines the factors during the design and planning phases of a project that affect rework. Developing these two tools will help increase transparency on the manufacturing shop floor and help reduce the amount of rework performed.","abstract_has_math":false,"creators":["Liu, Michael W. (Michael Wen-Tseng)"],"institution":"Massachusetts Institute of Technology","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":"Sloan School of Manufacturing.","school":null,"contributors":[],"advisors":["Dan Frey and Roy Welsch."],"committee_chairs":[],"committee_members":[],"year":2008,"date_issued":"2008","date_published":"2008","updated_at":"2026-07-22T22:20:54Z","subjects":["Engineering Systems Division.","Sloan School of Manufacturing.","Leaders for Manufacturing Program."],"languages":["eng"],"rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"rights_urls":["http://dspace.mit.edu/handle/1721.1/7582"],"identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/1721.1/43861","outbound_label":"Handle","outbound_source":"dc:identifier.uri"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Dan Frey and Roy Welsch."]},{"key":"dc:contributor.department","label":"Department","values":["Sloan School of Manufacturing.","Leaders for Manufacturing Program at MIT","Massachusetts Institute of Technology. Engineering Systems Division","Sloan School of Management"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Leaders for Manufacturing Program."]},{"key":"dc:creator","label":"Author","values":["Liu, Michael W. (Michael Wen-Tseng)"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2008-12-11T18:41:12Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2008-12-11T18:41:12Z"]},{"key":"dc:date.issued","label":"Date","values":["2008"]},{"key":"dc:publisher","label":"Institution","values":["Massachusetts Institute of Technology"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Engineering Systems Division.","Sloan School of Manufacturing.","Leaders for Manufacturing Program."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["eng"]},{"key":"dc:rights","label":"Dc Rights","values":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://dspace.mit.edu/handle/1721.1/7582"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1721.1/43861"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["Thesis (S.M.)--Massachusetts Institute of Technology, Engineering Systems Division; and, (M.B.A.) -- Massachusetts Institute of Technology, Sloan School of Management; in conjunction with the Leaders for Manufacturing Program at MIT, 2008.","Includes bibliographical references (p. 59-60)."]},{"key":"dc:description.abstract","label":"Abstract","values":["Over the past several years, Raytheon has experienced great growth in their revenue and sales. One of the contributing organizations to that growth has been the Space and Airborne Systems (SAS) business sector. To continue this growth, SAS has started initiatives to improve their Operations. One of these initiatives is to reduce the amount of rework performed within the manufacturing centers. By reducing rework, SAS will be able to reduce costs, meet aggressive schedules, and continue to satisfy customer's needs. This paper describes the development of two tools to reduce rework in an attempt to meet Raytheon's goals. One is a manufacturing/Earned-Value Measurement System monitoring tool. The second tool determines the factors during the design and planning phases of a project that affect rework. Developing these two tools will help increase transparency on the manufacturing shop floor and help reduce the amount of rework performed."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["M.B.A.","S.M."]},{"key":"dc:title","label":"Title","values":["Analysis of the effect of planning/design phase factors on rework"]}]}],"canonical_facts":{"dc:contributor.advisor":["Dan Frey and Roy Welsch."],"dc:contributor.department":["Sloan School of Manufacturing.","Leaders for Manufacturing Program at MIT","Massachusetts Institute of Technology. Engineering Systems Division","Sloan School of Management"],"dc:contributor.other":["Leaders for Manufacturing Program."],"dc:creator":["Liu, Michael W. (Michael Wen-Tseng)"],"dc:date.accessioned":["2008-12-11T18:41:12Z"],"dc:date.available":["2008-12-11T18:41:12Z"],"dc:date.issued":["2008"],"dc:description":["Thesis (S.M.)--Massachusetts Institute of Technology, Engineering Systems Division; and, (M.B.A.) -- Massachusetts Institute of Technology, Sloan School of Management; in conjunction with the Leaders for Manufacturing Program at MIT, 2008.","Includes bibliographical references (p. 59-60)."],"dc:description.abstract":["Over the past several years, Raytheon has experienced great growth in their revenue and sales. One of the contributing organizations to that growth has been the Space and Airborne Systems (SAS) business sector. To continue this growth, SAS has started initiatives to improve their Operations. One of these initiatives is to reduce the amount of rework performed within the manufacturing centers. By reducing rework, SAS will be able to reduce costs, meet aggressive schedules, and continue to satisfy customer's needs. This paper describes the development of two tools to reduce rework in an attempt to meet Raytheon's goals. One is a manufacturing/Earned-Value Measurement System monitoring tool. The second tool determines the factors during the design and planning phases of a project that affect rework. Developing these two tools will help increase transparency on the manufacturing shop floor and help reduce the amount of rework performed."],"dc:description.degree":["M.B.A.","S.M."],"dc:identifier.uri":["http://hdl.handle.net/1721.1/43861"],"dc:language.iso":["eng"],"dc:publisher":["Massachusetts Institute of Technology"],"dc:rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"dc:rights.uri":["http://dspace.mit.edu/handle/1721.1/7582"],"dc:subject":["Engineering Systems Division.","Sloan School of Manufacturing.","Leaders for Manufacturing Program."],"dc:title":["Analysis of the effect of planning/design phase factors on rework"],"dc:type":["Thesis"]},"updated_at":"2026-07-22T22:20:54Z"}