Development of the resource model for the Decision Aids for Tunneling (DAT)
Abstract
dc:description.abstractThe Decision Aids for Tunneling (DAT) are a computer based method with which distributions of tunnel construction time and cost as well as required and produced resources can be estimated considering uncertainties in geologic conditions, construction processes and resources. The results of the DAT in turn can be used for various decision making processes. Although the DAT included a resource management model, this was not at the same level as the other parts of the method. Hence, the main objectives of this research are to define the requirements for an adequate and comprehensive resource model for tunneling and develop a new resource model satisfying these new requirements. There are three major developments and contributions of the new resource models: 1. In order to have complete and accurate cost and time estimation, the new resource model can explicitly estimate the cost and time based on the actual amount of resources used for and produced from tunnel construction. 2. Resource scheduling and planning features have been implemented into the new resource model. This allows one to determine the optimal tunneling plan, which takes into account the technical precedence of the tunneling activities, the resource/space availability, the dynamic status of the process, and the work continuity. In addition, this optimal tunneling plan also satisfies the requirements for the special characteristics of the tunnel construction process such as different construction methods, cyclic operation, distance requirements between the headings and preempting activities. Most importantly, the optimal tunneling plan obtained from the new resource model optimizes resource allocation and leads to the shortest construction time. 3. The new resource model enhances the ability to represent the resource handling activities considering the locations where they are actually performed; thus the construction time can be estimated more accurately.
Degree
thesis:*- Department dc:contributor.department
- Massachusetts Institute of Technology. Dept. of Civil and Environmental Engineering.
- Grantor dc:publisher
- Massachusetts Institute of Technology
- Year dc:date.issued
- 2008
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Min, Sangyoon, 1973-
- Advisor dc:contributor.advisor
-
- Herbert H. Einstein.
Subjects
dc:subject × 1Rights
dc:rights- Statement dc:rights
-
- M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
- Licence dc:rights.uri
- Language dc:language.iso
- eng
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- http://hdl.handle.net/1721.1/43160
- OAI identifier oai:identifier
- oai:dspace.mit.edu:1721.1/43160