Back to results

Massachusetts Institute of Technology

Sequential investment planning for complex oil development projects

Abstract

dc:description.abstract

In this thesis, we consider sequential real investment decisions for the development of discovered oil prospects. Following a decision analysis approach, we propose a methodology to explore the upside of a dynamic drilling strategy, where there is a significant uncertainty about the reservoir complexity. We introduce the notion of information lag, whereby the decision-maker receives the information with a certain delay after each drilling is completed. In an illustrative case study, we apply our proposed methodology on a single reservoir to characterize the value of flexibility and to describe the relative impact of the information lags, in the context of an extensive drilling plan. We also provide several extensions of this case study in order to show how this methodology would be extended in a more comprehensive decision framework. Topics include choosing the optimal production capacity, valuing an initial test opportunity, and developing a field with multiple reservoirs. Our results indicate that flexible thinking may be a significant source of value to the projects. However, the incremental value might be over-rated if information lags are not appropriately included in the analysis.

Degree

thesis:*
Department dc:contributor.department
Massachusetts Institute of Technology. Dept. of Civil and Environmental Engineering.
Grantor dc:publisher
Massachusetts Institute of Technology
Year dc:date.issued
2008

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Aydın, Cevat Onur
Advisor dc:contributor.advisor
  • Patrick Jaillet.

Subjects

dc:subject × 1

Rights

dc:rights
Statement dc:rights
  • M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/1721.1/43051
OAI identifier oai:identifier
oai:dspace.mit.edu:1721.1/43051

Chain of custody

source
Harvested from
MIT
Base URL
dspace.mit.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Aydın, Cevat Onur. Sequential investment planning for complex oil development projects. Massachusetts Institute of Technology, 2008. http://hdl.handle.net/1721.1/43051