Massachusetts Institute of Technology
Pre-engagement process improvement in IBM PC services
Abstract
dc:description.abstractThe front end of the IBM PC factory integration & deployment process is a pre-engagement process. In this study, the pre-engagement process, was analyzed. The organizational structure in the pre-engagement process and the pre-engagement process flow were examined. The information flow in both the global supply chain and the IBM customer solution center was identified. The current service-offering model in the IBM customer solution center was also described. Two problems in the pre-engagement process were examined. A methodology to probe the problems and to figure out the root causes was proposed and applied. Five root causes were determined. Solutions were proposed to address those root causes and furthermore, their benefits and concerns were evaluated. In the end, a conclusion that Checklist A, Checklist B, and the continuous improvement process were the best and feasible solutions was drawn.
Degree
thesis:*- Department dc:contributor.department
- Massachusetts Institute of Technology. Dept. of Mechanical Engineering.
- Grantor dc:publisher
- Massachusetts Institute of Technology
- Year dc:date.issued
- 2007
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Zuo, Jie, M. Eng. Massachusetts Institute of Technology
- Advisor dc:contributor.advisor
-
- Stanley B. Gershwin.
Subjects
dc:subject × 1Rights
dc:rights- Statement dc:rights
-
- M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
- Licence dc:rights.uri
- Language dc:language.iso
- eng
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- http://hdl.handle.net/1721.1/42325
- OAI identifier oai:identifier
- oai:dspace.mit.edu:1721.1/42325