Back to results

Massachusetts Institute of Technology

Allocation of engineering resources to global sites based on coordination cost and project structure

Abstract

dc:description.abstract

Because of the increasingly globalized world we live in, companies today are very interested in going overseas to develop and utilize global engineering resources. By doing so, they hope to take advantage of new global product development (GPD) enablers and motivators such as the internet, new collaborative information technology tools, access to new markets, and the increasing availability of low-cost engineering talent. While globalization has significantly decreased barriers so that more companies are hurrying to move engineering activities to its global sites, it is no secret that GPD teams pose significant coordination challenges. Cost savings from lower labor rates abroad can easily be eaten up by the increased coordination costs required to manage overseas interactions between local and global activities. This paper introduces a model that maps a project's coordination structure to help managers decide which activities should be allocated to a global site and which ones should be kept at home. It introduces a new multi-site coordination matrix based on the Design Structure Matrix and an optimization model that chooses where to locate activities to minimize project coordination costs.

Degree

thesis:*
Department dc:contributor.department
Leaders for Manufacturing Program at MIT
Grantor dc:publisher
Massachusetts Institute of Technology
Year dc:date.issued
2007

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Chang, Sabrina
Advisor dc:contributor.advisor
  • Daniel Whitney and Steven D. Eppinger.

Subjects

dc:subject × 3

Rights

dc:rights
Statement dc:rights
  • M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/1721.1/39486
OAI identifier oai:identifier
oai:dspace.mit.edu:1721.1/39486

Chain of custody

source
Harvested from
MIT
Base URL
dspace.mit.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Chang, Sabrina. Allocation of engineering resources to global sites based on coordination cost and project structure. Massachusetts Institute of Technology, 2007. http://hdl.handle.net/1721.1/39486