Back to results

Massachusetts Institute of Technology

Human aspects of scheduling : a case study

Abstract

dc:description.abstract

This work presents a look at real-life production-floor scheduling, comparing and contrasting it to both normative OR theory and Cognitive Psychology theory. Relevant literature in OR, scheduling and psychology is reviewed, and gaps in theory are pointed out, calling for observation of real-life scheduling and for modeling of the cognitive processes underlying such activities. While normative theory and cognitive psychology theory suggest certain behaviors should be observed, a case study conducted with a large manufacturing company reveals real-life scheduling to be different from behavior expected by OR as well as by cognitive psychology. Future research is suggested, which may enable better modeling of human schedulers.

Degree

thesis:*
Department dc:contributor.department
Massachusetts Institute of Technology. Engineering Systems Division.
Grantor dc:publisher
Massachusetts Institute of Technology
Year dc:date.issued
2006

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Boasson, Yishai, 1973-
Advisor dc:contributor.advisor
  • John S. Carroll.

Subjects

dc:subject × 1

Rights

dc:rights
Statement dc:rights
  • M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/1721.1/38572
OAI identifier oai:identifier
oai:dspace.mit.edu:1721.1/38572

Chain of custody

source
Harvested from
MIT
Base URL
dspace.mit.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Boasson, Yishai, 1973-. Human aspects of scheduling : a case study. Massachusetts Institute of Technology, 2006. http://hdl.handle.net/1721.1/38572