{"id":{"repo_id":"mit","oai_identifier":"oai:dspace.mit.edu:1721.1/36645"},"canonical_url":"https://search.dev.ndltd.org/etd/mit/oai:dspace.mit.edu:1721.1/36645","repository":{"repo_id":"mit","name":"MIT","base_url":"https://dspace.mit.edu/oai/request"},"display":{"title":"Documentation requirements for contractor pursuit of delay claims","abstract":"Thesis (M.S.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, 1995.","abstract_html":"Thesis (M.S.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, 1995.","abstract_has_math":false,"creators":["Long, Darren S. (Darren Scott)"],"institution":"Massachusetts Institute of Technology","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":"Massachusetts Institute of Technology. Dept. of Civil and Environmental Engineering","school":null,"contributors":[],"advisors":["Robert D. Logcher."],"committee_chairs":[],"committee_members":[],"year":1995,"date_issued":"1995","date_published":"1995","updated_at":"2026-07-22T22:22:25Z","subjects":["Civil and Environmental Engineering"],"languages":["eng"],"rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"rights_urls":["http://dspace.mit.edu/handle/1721.1/7582"],"identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/1721.1/36645","outbound_label":"Handle","outbound_source":"dc:identifier.uri"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Robert D. Logcher."]},{"key":"dc:contributor.department","label":"Department","values":["Massachusetts Institute of Technology. Dept. of Civil and Environmental Engineering"]},{"key":"dc:creator","label":"Author","values":["Long, Darren S. (Darren Scott)"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2007-03-12T17:40:08Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2007-03-12T17:40:08Z"]},{"key":"dc:date.issued","label":"Date","values":["1995"]},{"key":"dc:publisher","label":"Institution","values":["Massachusetts Institute of Technology"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Civil and Environmental Engineering"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["eng"]},{"key":"dc:rights","label":"Dc Rights","values":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://dspace.mit.edu/handle/1721.1/7582"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1721.1/36645"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["Thesis (M.S.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, 1995.","Includes bibliographical references (leaves 127-135)."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["M.S."]},{"key":"dc:title","label":"Title","values":["Documentation requirements for contractor pursuit of delay claims"]}]}],"canonical_facts":{"dc:contributor.advisor":["Robert D. Logcher."],"dc:contributor.department":["Massachusetts Institute of Technology. Dept. of Civil and Environmental Engineering"],"dc:creator":["Long, Darren S. (Darren Scott)"],"dc:date.accessioned":["2007-03-12T17:40:08Z"],"dc:date.available":["2007-03-12T17:40:08Z"],"dc:date.issued":["1995"],"dc:description":["Thesis (M.S.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, 1995.","Includes bibliographical references (leaves 127-135)."],"dc:description.degree":["M.S."],"dc:identifier.uri":["http://hdl.handle.net/1721.1/36645"],"dc:language.iso":["eng"],"dc:publisher":["Massachusetts Institute of Technology"],"dc:rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"dc:rights.uri":["http://dspace.mit.edu/handle/1721.1/7582"],"dc:subject":["Civil and Environmental Engineering"],"dc:title":["Documentation requirements for contractor pursuit of delay claims"],"dc:type":["Thesis"]},"updated_at":"2026-07-22T22:22:25Z"}