Back to results

Massachusetts Institute of Technology

Intelligent order scheduling and release in a build to order environment

Abstract

dc:description.abstract

Dell's computer manufacturing process involves a complex system of material flow and assembly. This includes intelligent replenishment of sub-components from local warehouses according to the manufacturing schedule, just-in-time manufacturing of custom configured computer systems including hard-drive image and custom software download, packaging the unit for delivery, order accumulation, and finally, distribution and shipping to the customer. This thesis examines Dell's current order fulfillment process and suggests methods that can help Dell meet or exceed customers' delivery time air shipments to certain destinations could be converted to less expensive ground shipments. However, this is only possible when the entire fulfillment process is integrated in such a way that eligible ground shipments meet their appropriate shipping windows. This analysis shows that optimizing these windows not only requires an examination of the average cycle time in each phase but also of the impact that cycle time variations have on the expectations at minimum logistics cost in the just-in-time environment. By manufacturing and shipping products based on certain times of the day, success of this air-to-ground conversion strategy. Through the use of simulation models I found that the key factors in reducing logistics cost require setting appropriate scheduling rules for each order size and reducing the cycle time variation.

Degree

thesis:*
Department dc:contributor.department
Leaders for Manufacturing Program at MIT
Grantor dc:publisher
Massachusetts Institute of Technology
Year dc:date.issued
2004

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Vainio, Tanja, 1974-
Advisor dc:contributor.advisor
  • Thomas Roemer and David Simchi-Levi.

Subjects

dc:subject × 3

Rights

dc:rights
Statement dc:rights
  • M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/1721.1/34780
OAI identifier oai:identifier
oai:dspace.mit.edu:1721.1/34780

Chain of custody

source
Harvested from
MIT
Base URL
dspace.mit.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Vainio, Tanja, 1974-. Intelligent order scheduling and release in a build to order environment. Massachusetts Institute of Technology, 2004. http://hdl.handle.net/1721.1/34780