Back to results

Massachusetts Institute of Technology

Addressing equipment set-up time and manufacturing cost through real time inline inspection in tantalum wire manufacturing

Abstract

dc:description.abstract

For this study, a novel wire inspection system was developed to detect surface defects and monitor diameter real-time during the final wire drawing operation. Throughout his work, it was proven that the new inspection system was able to catch common wire defects under manufacturing conditions (wire speed). Furthermore, defect density limits were defined based on data collected during this study. A production version of the wire inspection system was jointly developed with the equipment supplier and an order was placed for three complete systems to be installed in all final draw machines. Increased competition and poor economic conditions forced the manufacturer to place an unprecedented focus on decreasing manufacturing costs. The wire inspection system reported in this thesis was developed with the objective of increasing productivity at the most critical operation in the factory; final wire drawing.

Degree

thesis:*
Department dc:contributor.department
Leaders for Manufacturing Program at MIT
Grantor dc:publisher
Massachusetts Institute of Technology
Year dc:date.issued
2004

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • González, Carlos A. (Carlos Alberto), 1972-
Advisor dc:contributor.advisor
  • Roy E. Welsch and Thomas W. Eagar.

Subjects

dc:subject × 3

Rights

dc:rights
Statement dc:rights
  • M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/1721.1/34766
OAI identifier oai:identifier
oai:dspace.mit.edu:1721.1/34766

Chain of custody

source
Harvested from
MIT
Base URL
dspace.mit.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

González, Carlos A. (Carlos Alberto), 1972-. Addressing equipment set-up time and manufacturing cost through real time inline inspection in tantalum wire manufacturing. Massachusetts Institute of Technology, 2004. http://hdl.handle.net/1721.1/34766