{"id":{"repo_id":"mit","oai_identifier":"oai:dspace.mit.edu:1721.1/34708"},"canonical_url":"https://search.dev.ndltd.org/etd/mit/oai:dspace.mit.edu:1721.1/34708","repository":{"repo_id":"mit","name":"MIT","base_url":"https://dspace.mit.edu/oai/request"},"display":{"title":"Co-ordinating flows across supply chains in the low volume gas turbine industry","abstract":"The industrial gas turbine (IGT) market is experiencing exponential growth where competition is based upon technical performance and time to market. Product sales are limited by the ability of the Original Equipment Manufacturer (OEM) to coordinate manufacturers and assemblers to deliver turbines to customers in a timely manner. The company's logistics and supply chain systems have evolved from a traditional low volume job-shop environment and must now cope with a marked increase in product demand. OEM's must now manage the manufacture and assembly of thousands of turbine parts across an international and complex supply chain in a robust and agile manner. This requires the effective integration of internal and external logistics, supply chain and engineering talent. Current performance has been plagued with poor sourcing reliability, low quality and exploding lead times. This has resulted in sluggish response to customer demand and loss in earnings. This thesis seeks to recommend inventory placement strategies to improve sourcing reliability while identifying root causes and recommending improvements. It will also address the importance of the time-value of material in addressing investment and materials management decisions.","abstract_html":"The industrial gas turbine (IGT) market is experiencing exponential growth where competition is based upon technical performance and time to market. Product sales are limited by the ability of the Original Equipment Manufacturer (OEM) to coordinate manufacturers and assemblers to deliver turbines to customers in a timely manner. The company&#x27;s logistics and supply chain systems have evolved from a traditional low volume job-shop environment and must now cope with a marked increase in product demand. OEM&#x27;s must now manage the manufacture and assembly of thousands of turbine parts across an international and complex supply chain in a robust and agile manner. This requires the effective integration of internal and external logistics, supply chain and engineering talent. Current performance has been plagued with poor sourcing reliability, low quality and exploding lead times. This has resulted in sluggish response to customer demand and loss in earnings. This thesis seeks to recommend inventory placement strategies to improve sourcing reliability while identifying root causes and recommending improvements. It will also address the importance of the time-value of material in addressing investment and materials management decisions.","abstract_has_math":false,"creators":["Park, Miriam, 1971-"],"institution":"Massachusetts Institute of Technology","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":"Leaders for Manufacturing Program at MIT","school":null,"contributors":[],"advisors":["Donald B. Rosenfield and Thomas W. Eager."],"committee_chairs":[],"committee_members":[],"year":2000,"date_issued":"2000","date_published":"2000","updated_at":"2026-07-22T22:22:14Z","subjects":["Sloan School of Management.","Materials Science and Engineering.","Leaders for Manufacturing Program."],"languages":["eng"],"rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"rights_urls":["http://theses.mit.edu/Dienst/UI/2.0/Describe/0018.mit.theses%2f2000-88","http://dspace.mit.edu/handle/1721.1/7582"],"identifier_entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://theses.mit.edu/Dienst/UI/2.0/Describe/0018.mit.theses%2f2000-88"],"render_values":[{"text":"http://theses.mit.edu/Dienst/UI/2.0/Describe/0018.mit.theses%2f2000-88","href":"http://theses.mit.edu/Dienst/UI/2.0/Describe/0018.mit.theses%2f2000-88","code":true}]}]},"links":{"outbound_url":"http://hdl.handle.net/1721.1/34708","outbound_label":"Handle","outbound_source":"dc:identifier.uri"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Donald B. Rosenfield and Thomas W. Eager."]},{"key":"dc:contributor.department","label":"Department","values":["Leaders for Manufacturing Program at MIT","Massachusetts Institute of Technology. Department of Materials Science and Engineering","Sloan School of Management"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Leaders for Manufacturing Program."]},{"key":"dc:creator","label":"Author","values":["Park, Miriam, 1971-"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2006-11-08T16:23:15Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2006-11-08T16:23:15Z"]},{"key":"dc:date.issued","label":"Date","values":["2000"]},{"key":"dc:publisher","label":"Institution","values":["Massachusetts Institute of Technology"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Sloan School of Management.","Materials Science and Engineering.","Leaders for Manufacturing Program."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["eng"]},{"key":"dc:rights","label":"Dc Rights","values":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://theses.mit.edu/Dienst/UI/2.0/Describe/0018.mit.theses%2f2000-88","http://dspace.mit.edu/handle/1721.1/7582"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://theses.mit.edu/Dienst/UI/2.0/Describe/0018.mit.theses%2f2000-88","http://hdl.handle.net/1721.1/34708"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["Thesis (S.M.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Dept. of Materials Science and Engineering; in conjunction with the Leaders for Manufacturing Program, Massachusetts Institute of Technology, 2000.","Also available online at the MIT Theses Online homepage <http://thesis.mit.edu>.","Includes bibliographical references (p. 80)."]},{"key":"dc:description.abstract","label":"Abstract","values":["The industrial gas turbine (IGT) market is experiencing exponential growth where competition is based upon technical performance and time to market. Product sales are limited by the ability of the Original Equipment Manufacturer (OEM) to coordinate manufacturers and assemblers to deliver turbines to customers in a timely manner. The company's logistics and supply chain systems have evolved from a traditional low volume job-shop environment and must now cope with a marked increase in product demand. OEM's must now manage the manufacture and assembly of thousands of turbine parts across an international and complex supply chain in a robust and agile manner. This requires the effective integration of internal and external logistics, supply chain and engineering talent. Current performance has been plagued with poor sourcing reliability, low quality and exploding lead times. This has resulted in sluggish response to customer demand and loss in earnings. This thesis seeks to recommend inventory placement strategies to improve sourcing reliability while identifying root causes and recommending improvements. It will also address the importance of the time-value of material in addressing investment and materials management decisions."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["S.M."]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Co-ordinating flows across supply chains in the low volume gas turbine industry"]}]}],"canonical_facts":{"dc:contributor.advisor":["Donald B. Rosenfield and Thomas W. Eager."],"dc:contributor.department":["Leaders for Manufacturing Program at MIT","Massachusetts Institute of Technology. Department of Materials Science and Engineering","Sloan School of Management"],"dc:contributor.other":["Leaders for Manufacturing Program."],"dc:creator":["Park, Miriam, 1971-"],"dc:date.accessioned":["2006-11-08T16:23:15Z"],"dc:date.available":["2006-11-08T16:23:15Z"],"dc:date.issued":["2000"],"dc:description":["Thesis (S.M.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Dept. of Materials Science and Engineering; in conjunction with the Leaders for Manufacturing Program, Massachusetts Institute of Technology, 2000.","Also available online at the MIT Theses Online homepage <http://thesis.mit.edu>.","Includes bibliographical references (p. 80)."],"dc:description.abstract":["The industrial gas turbine (IGT) market is experiencing exponential growth where competition is based upon technical performance and time to market. Product sales are limited by the ability of the Original Equipment Manufacturer (OEM) to coordinate manufacturers and assemblers to deliver turbines to customers in a timely manner. The company's logistics and supply chain systems have evolved from a traditional low volume job-shop environment and must now cope with a marked increase in product demand. OEM's must now manage the manufacture and assembly of thousands of turbine parts across an international and complex supply chain in a robust and agile manner. This requires the effective integration of internal and external logistics, supply chain and engineering talent. Current performance has been plagued with poor sourcing reliability, low quality and exploding lead times. This has resulted in sluggish response to customer demand and loss in earnings. This thesis seeks to recommend inventory placement strategies to improve sourcing reliability while identifying root causes and recommending improvements. It will also address the importance of the time-value of material in addressing investment and materials management decisions."],"dc:description.degree":["S.M."],"dc:format.mimetype":["application/pdf"],"dc:identifier.uri":["http://theses.mit.edu/Dienst/UI/2.0/Describe/0018.mit.theses%2f2000-88","http://hdl.handle.net/1721.1/34708"],"dc:language.iso":["eng"],"dc:publisher":["Massachusetts Institute of Technology"],"dc:rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"dc:rights.uri":["http://theses.mit.edu/Dienst/UI/2.0/Describe/0018.mit.theses%2f2000-88","http://dspace.mit.edu/handle/1721.1/7582"],"dc:subject":["Sloan School of Management.","Materials Science and Engineering.","Leaders for Manufacturing Program."],"dc:title":["Co-ordinating flows across supply chains in the low volume gas turbine industry"],"dc:type":["Thesis"]},"updated_at":"2026-07-22T22:22:14Z"}