Back to results

Massachusetts Institute of Technology

Achieving mass customization in the Boeing Wire Responsibility Center

Abstract

dc:description.abstract

Customized options are costly to produce using the current production and design methods of the Boeing Commercial Airplane Group (BCAG). The company is redesigning its engineering and manufacturing processes in order to enhance its ability to deliver customized options cost effectively. The majority of the company's continuous improvement efforts to date have centered on either its manufacturing operations or its engineering processes, and significant progress has been made in the areas of lean production and reduced flowtimes. While there is still plenty of room for improvement within each functional group of the business, there is arguably much more opportunity for improvement in the relationships between functional groups. The thesis analyzes the potential for significant cost improvements of initiatives that focus on formalizing cross functional continuous improvement relationships between the engineering and manufacturing groups. The analysis is conducted in the form of a case study of the company's Wire Responsibility Center (WIRC), which has the distinction of handling more customization, variability and change than most other areas of the company. This high degree of variation is coupled with large volumes of product - hundreds of units per plane - to produce fertile ground for the study of process improvements between engineering and manufacturing teams. This study shows the significant impact of the WIRC's Change, Error, and Rework (CER) Initiative on the quality and cost of its products and offers suggestions for further improvement. The thesis concludes with a discussion of how effective application of the lessons learned from this pilot project could greatly improve the profitability of The Boeing Company's Commercial Airplane Group.

Degree

thesis:*
Department dc:contributor.department
Leaders for Manufacturing Program at MIT
Grantor dc:publisher
Massachusetts Institute of Technology
Year dc:date.issued
2000

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Napier, Matthew Kirk, 1968-
Advisor dc:contributor.advisor
  • Duncan Simester and Kevin Otto.

Subjects

dc:subject × 3

Rights

dc:rights
Statement dc:rights
  • M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
Language dc:language.iso
eng

Identifiers

dc:identifier.*
OAI identifier oai:identifier
oai:dspace.mit.edu:1721.1/34705

Chain of custody

source
Harvested from
MIT
Base URL
dspace.mit.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Napier, Matthew Kirk, 1968-. Achieving mass customization in the Boeing Wire Responsibility Center. Massachusetts Institute of Technology, 2000. http://hdl.handle.net/1721.1/34705