{"id":{"repo_id":"mit","oai_identifier":"oai:dspace.mit.edu:1721.1/32471"},"canonical_url":"https://search.dev.ndltd.org/etd/mit/oai:dspace.mit.edu:1721.1/32471","repository":{"repo_id":"mit","name":"MIT","base_url":"https://dspace.mit.edu/oai/request"},"display":{"title":"The role of SCADA in developing a lean enterprise for municipal wastewater operations","abstract":"Central to optimizing a wastewater system's operations is the collection of alarm and operational data from various remote locations throughout a municipality, hence the basic need for supervisory control and data acquisition (SCADA). The process of providing SCADA systems to municipal clients, from conception to implementation, is typically a cumbersome process involving a wide variety of stakeholders. Municipalities have historically been slow to change, often being among the last in adopting new processes and technologies. Municipal SCADA systems usually are deployed without considering how they will specifically create value for municipality end-users and without defining metrics to gauge their effectiveness. Lean enterprise principals suggest a focus on the value stream can reduce waste and improve the value municipality end-users derive from SCADA systems. The author performs a lean analysis of the process of implementing SCADA within a municipal wastewater operation. The municipality's current systems integrator-centric model for SCADA delivery is examined. An alternate lean vision is proposed for the integrator's operations and their relationship with the municipality. This vision reduces SCADA implementation time and costs while improving the effectiveness of the SCADA solution.","abstract_html":"Central to optimizing a wastewater system&#x27;s operations is the collection of alarm and operational data from various remote locations throughout a municipality, hence the basic need for supervisory control and data acquisition (SCADA). The process of providing SCADA systems to municipal clients, from conception to implementation, is typically a cumbersome process involving a wide variety of stakeholders. Municipalities have historically been slow to change, often being among the last in adopting new processes and technologies. Municipal SCADA systems usually are deployed without considering how they will specifically create value for municipality end-users and without defining metrics to gauge their effectiveness. Lean enterprise principals suggest a focus on the value stream can reduce waste and improve the value municipality end-users derive from SCADA systems. The author performs a lean analysis of the process of implementing SCADA within a municipal wastewater operation. The municipality&#x27;s current systems integrator-centric model for SCADA delivery is examined. An alternate lean vision is proposed for the integrator&#x27;s operations and their relationship with the municipality. This vision reduces SCADA implementation time and costs while improving the effectiveness of the SCADA solution.","abstract_has_math":false,"creators":["Prutz, Stanley J"],"institution":"Massachusetts Institute of Technology","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":"System Design and Management Program.","school":null,"contributors":[],"advisors":["Deborah Nightingale."],"committee_chairs":[],"committee_members":[],"year":2005,"date_issued":"2005","date_published":"2005","updated_at":"2026-07-22T22:21:26Z","subjects":["System Design and Management Program."],"languages":["eng"],"rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"rights_urls":["http://dspace.mit.edu/handle/1721.1/7582"],"identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/1721.1/32471","outbound_label":"Handle","outbound_source":"dc:identifier.uri"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Deborah Nightingale."]},{"key":"dc:contributor.department","label":"Department","values":["System Design and Management Program."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["System Design and Management Program."]},{"key":"dc:creator","label":"Author","values":["Prutz, Stanley J"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2006-03-29T18:47:30Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2006-03-29T18:47:30Z"]},{"key":"dc:date.issued","label":"Date","values":["2005"]},{"key":"dc:publisher","label":"Institution","values":["Massachusetts Institute of Technology"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["System Design and Management Program."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["eng"]},{"key":"dc:rights","label":"Dc Rights","values":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://dspace.mit.edu/handle/1721.1/7582"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1721.1/32471"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["Thesis (S.M.)--Massachusetts Institute of Technology, System Design and Management Program, 2005.","Includes bibliographical references (p. 115-116)."]},{"key":"dc:description.abstract","label":"Abstract","values":["Central to optimizing a wastewater system's operations is the collection of alarm and operational data from various remote locations throughout a municipality, hence the basic need for supervisory control and data acquisition (SCADA). The process of providing SCADA systems to municipal clients, from conception to implementation, is typically a cumbersome process involving a wide variety of stakeholders. Municipalities have historically been slow to change, often being among the last in adopting new processes and technologies. Municipal SCADA systems usually are deployed without considering how they will specifically create value for municipality end-users and without defining metrics to gauge their effectiveness. Lean enterprise principals suggest a focus on the value stream can reduce waste and improve the value municipality end-users derive from SCADA systems. The author performs a lean analysis of the process of implementing SCADA within a municipal wastewater operation. The municipality's current systems integrator-centric model for SCADA delivery is examined. An alternate lean vision is proposed for the integrator's operations and their relationship with the municipality. This vision reduces SCADA implementation time and costs while improving the effectiveness of the SCADA solution."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["S.M."]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["The role of SCADA in developing a lean enterprise for municipal wastewater operations"]}]}],"canonical_facts":{"dc:contributor.advisor":["Deborah Nightingale."],"dc:contributor.department":["System Design and Management Program."],"dc:contributor.other":["System Design and Management Program."],"dc:creator":["Prutz, Stanley J"],"dc:date.accessioned":["2006-03-29T18:47:30Z"],"dc:date.available":["2006-03-29T18:47:30Z"],"dc:date.issued":["2005"],"dc:description":["Thesis (S.M.)--Massachusetts Institute of Technology, System Design and Management Program, 2005.","Includes bibliographical references (p. 115-116)."],"dc:description.abstract":["Central to optimizing a wastewater system's operations is the collection of alarm and operational data from various remote locations throughout a municipality, hence the basic need for supervisory control and data acquisition (SCADA). The process of providing SCADA systems to municipal clients, from conception to implementation, is typically a cumbersome process involving a wide variety of stakeholders. Municipalities have historically been slow to change, often being among the last in adopting new processes and technologies. Municipal SCADA systems usually are deployed without considering how they will specifically create value for municipality end-users and without defining metrics to gauge their effectiveness. Lean enterprise principals suggest a focus on the value stream can reduce waste and improve the value municipality end-users derive from SCADA systems. The author performs a lean analysis of the process of implementing SCADA within a municipal wastewater operation. The municipality's current systems integrator-centric model for SCADA delivery is examined. An alternate lean vision is proposed for the integrator's operations and their relationship with the municipality. This vision reduces SCADA implementation time and costs while improving the effectiveness of the SCADA solution."],"dc:description.degree":["S.M."],"dc:format.mimetype":["application/pdf"],"dc:identifier.uri":["http://hdl.handle.net/1721.1/32471"],"dc:language.iso":["eng"],"dc:publisher":["Massachusetts Institute of Technology"],"dc:rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"dc:rights.uri":["http://dspace.mit.edu/handle/1721.1/7582"],"dc:subject":["System Design and Management Program."],"dc:title":["The role of SCADA in developing a lean enterprise for municipal wastewater operations"],"dc:type":["Thesis"]},"updated_at":"2026-07-22T22:21:26Z"}