{"id":{"repo_id":"mit","oai_identifier":"oai:dspace.mit.edu:1721.1/155992"},"canonical_url":"https://search.dev.ndltd.org/etd/mit/oai:dspace.mit.edu:1721.1/155992","repository":{"repo_id":"mit","name":"MIT","base_url":"https://dspace.mit.edu/oai/request"},"display":{"title":"Optimizing Integrated Continuous Biomanufacturing Throughput: Resource Constraints and Process Scheduling","abstract":"The purpose of this thesis is to understand the available capacity of a biomanufacturing facility with respect to a product of interest. Further, the thesis aims to find opportunity to increase the system’s throughput and to determine whether current labor resources are sufficient to enable production at this level. To address these questions, the system will first be understood at a high level with preliminary analysis of its available capacity and of resource capacity utilization. A more robust available capacity analysis will then be performed by accounting for resource constraints. To this end, makespan minimization models will be created to evaluate optimal process scheduling given resource constraints. The analysis results showed that, at this time, labor is not a constraint to the system’s available capacity and that improvements to process scheduling can increase the system’s throughput at current labor levels. Finally, the thesis will evaluate new operating strategies, based on the new-found system understanding, which strive to decrease volatility of system throughput. The methods used in this thesis aim to cut through daily variability to understand fundamental production requirements. While this study was performed at a biomanufacturing facility, the methods are applicable to a wide range of industries.","abstract_html":"The purpose of this thesis is to understand the available capacity of a biomanufacturing facility with respect to a product of interest. Further, the thesis aims to find opportunity to increase the system’s throughput and to determine whether current labor resources are sufficient to enable production at this level. To address these questions, the system will first be understood at a high level with preliminary analysis of its available capacity and of resource capacity utilization. A more robust available capacity analysis will then be performed by accounting for resource constraints. To this end, makespan minimization models will be created to evaluate optimal process scheduling given resource constraints. The analysis results showed that, at this time, labor is not a constraint to the system’s available capacity and that improvements to process scheduling can increase the system’s throughput at current labor levels. Finally, the thesis will evaluate new operating strategies, based on the new-found system understanding, which strive to decrease volatility of system throughput. The methods used in this thesis aim to cut through daily variability to understand fundamental production requirements. While this study was performed at a biomanufacturing facility, the methods are applicable to a wide range of industries.","abstract_has_math":false,"creators":["Haddad, Ana"],"institution":"Massachusetts Institute of Technology","degree_name":"Master","degree_level":null,"degree_discipline":null,"degree_department":"Massachusetts Institute of Technology. Department of Mechanical Engineering","school":null,"contributors":[],"advisors":["Krebs, Hermano","Willems, Sean"],"committee_chairs":[],"committee_members":[],"year":2024,"date_issued":"2024-05","date_published":"2024-05","updated_at":"2026-07-22T22:21:48Z","subjects":[],"languages":[],"rights":["In Copyright - Educational Use Permitted","Copyright retained by author(s)"],"rights_urls":["https://rightsstatements.org/page/InC-EDU/1.0/"],"identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/1721.1/155992","outbound_label":"Handle","outbound_source":"dc:identifier.uri"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Krebs, Hermano","Willems, Sean"]},{"key":"dc:contributor.department","label":"Department","values":["Massachusetts Institute of Technology. Department of Mechanical Engineering","Sloan School of Management"]},{"key":"dc:creator","label":"Author","values":["Haddad, Ana"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2024-08-12T14:13:47Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2024-08-12T14:13:47Z"]},{"key":"dc:date.issued","label":"Date","values":["2024-05"]},{"key":"dc:publisher","label":"Institution","values":["Massachusetts Institute of Technology"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master","Master of Science in Mechanical Engineering","Master of Business Administration"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["In Copyright - Educational Use Permitted","Copyright retained by author(s)"]},{"key":"dc:rights.uri","label":"Rights URI","values":["https://rightsstatements.org/page/InC-EDU/1.0/"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/1721.1/155992"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The purpose of this thesis is to understand the available capacity of a biomanufacturing facility with respect to a product of interest. Further, the thesis aims to find opportunity to increase the system’s throughput and to determine whether current labor resources are sufficient to enable production at this level. To address these questions, the system will first be understood at a high level with preliminary analysis of its available capacity and of resource capacity utilization. A more robust available capacity analysis will then be performed by accounting for resource constraints. To this end, makespan minimization models will be created to evaluate optimal process scheduling given resource constraints. The analysis results showed that, at this time, labor is not a constraint to the system’s available capacity and that improvements to process scheduling can increase the system’s throughput at current labor levels. Finally, the thesis will evaluate new operating strategies, based on the new-found system understanding, which strive to decrease volatility of system throughput. The methods used in this thesis aim to cut through daily variability to understand fundamental production requirements. While this study was performed at a biomanufacturing facility, the methods are applicable to a wide range of industries."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["S.M.","M.B.A."]},{"key":"dc:title","label":"Title","values":["Optimizing Integrated Continuous Biomanufacturing Throughput: Resource Constraints and Process Scheduling"]}]}],"canonical_facts":{"dc:contributor.advisor":["Krebs, Hermano","Willems, Sean"],"dc:contributor.department":["Massachusetts Institute of Technology. Department of Mechanical Engineering","Sloan School of Management"],"dc:creator":["Haddad, Ana"],"dc:date.accessioned":["2024-08-12T14:13:47Z"],"dc:date.available":["2024-08-12T14:13:47Z"],"dc:date.issued":["2024-05"],"dc:description.abstract":["The purpose of this thesis is to understand the available capacity of a biomanufacturing facility with respect to a product of interest. Further, the thesis aims to find opportunity to increase the system’s throughput and to determine whether current labor resources are sufficient to enable production at this level. To address these questions, the system will first be understood at a high level with preliminary analysis of its available capacity and of resource capacity utilization. A more robust available capacity analysis will then be performed by accounting for resource constraints. To this end, makespan minimization models will be created to evaluate optimal process scheduling given resource constraints. The analysis results showed that, at this time, labor is not a constraint to the system’s available capacity and that improvements to process scheduling can increase the system’s throughput at current labor levels. Finally, the thesis will evaluate new operating strategies, based on the new-found system understanding, which strive to decrease volatility of system throughput. The methods used in this thesis aim to cut through daily variability to understand fundamental production requirements. While this study was performed at a biomanufacturing facility, the methods are applicable to a wide range of industries."],"dc:description.degree":["S.M.","M.B.A."],"dc:identifier.uri":["https://hdl.handle.net/1721.1/155992"],"dc:publisher":["Massachusetts Institute of Technology"],"dc:rights":["In Copyright - Educational Use Permitted","Copyright retained by author(s)"],"dc:rights.uri":["https://rightsstatements.org/page/InC-EDU/1.0/"],"dc:title":["Optimizing Integrated Continuous Biomanufacturing Throughput: Resource Constraints and Process Scheduling"],"dc:type":["Thesis"],"thesis:degree_name":["Master","Master of Science in Mechanical Engineering","Master of Business Administration"]},"updated_at":"2026-07-22T22:21:48Z"}