Analysis of Data from the U.S. Shipbuilding Industry and Application to Improve Performance Metrics

Abstract

dc:description.abstract

The U.S. Navy is seeking to increase the number of ships in the fleet due to growing threats, however shipyards are facing numerous issues leading to a delay in the delivery of naval warships along with cost overruns. At the same time, there is significant data available from the construction process, creating an opportunity for data analysis with the intention of identifying and hopefully resolving some of these issues. Addressing these concerns, this thesis scrutinizes Earned Value Management (EVM) data from actual shipbuilding projects, capitalizing on the datasets available to help identify the root causes of such delays. The study begins with data cleaning, an essential step that ensures the real-world data’s integrity and relevance. Preliminary data analysis was then conducted to explore cost variance, schedule adherence, and the learning curve effect observed across different hulls, setting the stage for deeper investigative modeling. Following model exploration and selection, the core of the thesis is a predictive model that uses polynomial and linear regression to predict the progression of costs over time and comparison to the prediction metrics currently in use. A regression model was chosen over more complex models like a long short-term memory (LSTM) neural network due to its simplicity, interpretability, and ease of retraining with new data, ensuring that stakeholders can readily understand and apply the model’s insights while maintaining its relevance over time. The target prediction metric for this model is the Actual Cost of Work Performed (ACWP), however similar models could also be leveraged to predict schedule. In creating this model, several features were analyzed including both the Budgeted Cost of Work Scheduled (BCWS) and the Budget at Completion (BAC), both known metrics at the start of construction. After testing various combinations of these features and comparing the mean squared error (MSE), the chosen model uses time and BCWS divided by BAC as input features, serving as a budgeted completion percentage. The model is tailored further to reflect industry-specific cost behaviors, enforcing non-negative, cumulative cost predictions. This model was trained, tested and validated using EVM data from one key event (KE), a specific subset of the overall ship construction process with the intent that it could be applied to all key events and aggregated to provide cost predictions for an 2entire hull. This thesis will ideally serve as a framework for shipyards to improve project cost predictions and identify indicators of large cost overruns early enough to correct them within the ship construction timeline.

Degree

thesis:*
Name thesis:degree_name
Master
Department dc:contributor.department
Massachusetts Institute of Technology. Department of Electrical Engineering and Computer Science
Grantor dc:publisher
Massachusetts Institute of Technology
Year dc:date.issued
2024

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Willis, Heather L.
Advisors dc:contributor.advisor
  • Gillespy, Andrew
  • Daniel, Luca

Rights

dc:rights
Statement dc:rights
  • In Copyright - Educational Use Permitted
  • Copyright retained by author(s)

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/1721.1/155863
OAI identifier oai:identifier
oai:dspace.mit.edu:1721.1/155863

Chain of custody

source
Harvested from
MIT
Base URL
dspace.mit.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
related terms
citation

Willis, Heather L.. Analysis of Data from the U.S. Shipbuilding Industry and Application to Improve Performance Metrics. Massachusetts Institute of Technology, 2024. https://hdl.handle.net/1721.1/155863