{"id":{"repo_id":"mit","oai_identifier":"oai:dspace.mit.edu:1721.1/146651"},"canonical_url":"https://search.dev.ndltd.org/etd/mit/oai:dspace.mit.edu:1721.1/146651","repository":{"repo_id":"mit","name":"MIT","base_url":"https://dspace.mit.edu/oai/request"},"display":{"title":"Improving Operational Efficiency of a Small Manufacturing Maintenance Organization","abstract":"Many small manufacturers struggle with poor maintenance efficiency, resulting in high maintenance costs and/or frequent equipment breakdowns. Existing literature addresses which tasks to prioritize and how to measure results, but there is little prior work on how to accomplish more maintenance work overall with the same resources and reduce maintenance wastes. We develop a framework for conceptualizing maintenance operational efficiency as a complement to maintenance strategy, focusing on the primary maintenance process: backlog, diagnosis, planning, getting parts, executing, and observing effects. We apply this framework to a small Michigan manufacturing facility. We estimate the cost of equipment breakdowns at the facility using a novel cross-referencing between maintenance breakdowns and production bottlenecks. Finally, we propose several improvements to target wastes in each step of the primary maintenance process: shared ownership of equipment between maintenance and production, more accessible documentation, a work order system, proximal spare parts storage, and solving problems permanently.","abstract_html":"Many small manufacturers struggle with poor maintenance efficiency, resulting in high maintenance costs and/or frequent equipment breakdowns. Existing literature addresses which tasks to prioritize and how to measure results, but there is little prior work on how to accomplish more maintenance work overall with the same resources and reduce maintenance wastes. We develop a framework for conceptualizing maintenance operational efficiency as a complement to maintenance strategy, focusing on the primary maintenance process: backlog, diagnosis, planning, getting parts, executing, and observing effects. We apply this framework to a small Michigan manufacturing facility. We estimate the cost of equipment breakdowns at the facility using a novel cross-referencing between maintenance breakdowns and production bottlenecks. Finally, we propose several improvements to target wastes in each step of the primary maintenance process: shared ownership of equipment between maintenance and production, more accessible documentation, a work order system, proximal spare parts storage, and solving problems permanently.","abstract_has_math":false,"creators":["Poler, Colin"],"institution":"Massachusetts Institute of Technology","degree_name":"Master","degree_level":null,"degree_discipline":null,"degree_department":"Massachusetts Institute of Technology. Department of Electrical Engineering and Computer Science","school":null,"contributors":[],"advisors":["Boning, Duane","Repenning, Nelson"],"committee_chairs":[],"committee_members":[],"year":2022,"date_issued":"2022-05","date_published":"2022-05","updated_at":"2026-07-22T22:22:31Z","subjects":[],"languages":[],"rights":["In Copyright - Educational Use Permitted","Copyright retained by author(s)"],"rights_urls":["https://rightsstatements.org/page/InC-EDU/1.0/"],"identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/1721.1/146651","outbound_label":"Handle","outbound_source":"dc:identifier.uri"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Boning, Duane","Repenning, Nelson"]},{"key":"dc:contributor.department","label":"Department","values":["Massachusetts Institute of Technology. Department of Electrical Engineering and Computer Science","Sloan School of Management"]},{"key":"dc:creator","label":"Author","values":["Poler, Colin"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2022-11-30T19:39:05Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2022-11-30T19:39:05Z"]},{"key":"dc:date.issued","label":"Date","values":["2022-05"]},{"key":"dc:publisher","label":"Institution","values":["Massachusetts Institute of Technology"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master","Master of Science in Electrical Engineering and Computer Science","Master of Business Administration"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["In Copyright - Educational Use Permitted","Copyright retained by author(s)"]},{"key":"dc:rights.uri","label":"Rights URI","values":["https://rightsstatements.org/page/InC-EDU/1.0/"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/1721.1/146651"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Many small manufacturers struggle with poor maintenance efficiency, resulting in high maintenance costs and/or frequent equipment breakdowns. Existing literature addresses which tasks to prioritize and how to measure results, but there is little prior work on how to accomplish more maintenance work overall with the same resources and reduce maintenance wastes. We develop a framework for conceptualizing maintenance operational efficiency as a complement to maintenance strategy, focusing on the primary maintenance process: backlog, diagnosis, planning, getting parts, executing, and observing effects. We apply this framework to a small Michigan manufacturing facility. We estimate the cost of equipment breakdowns at the facility using a novel cross-referencing between maintenance breakdowns and production bottlenecks. Finally, we propose several improvements to target wastes in each step of the primary maintenance process: shared ownership of equipment between maintenance and production, more accessible documentation, a work order system, proximal spare parts storage, and solving problems permanently."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["S.M.","M.B.A."]},{"key":"dc:title","label":"Title","values":["Improving Operational Efficiency of a Small Manufacturing Maintenance Organization"]}]}],"canonical_facts":{"dc:contributor.advisor":["Boning, Duane","Repenning, Nelson"],"dc:contributor.department":["Massachusetts Institute of Technology. Department of Electrical Engineering and Computer Science","Sloan School of Management"],"dc:creator":["Poler, Colin"],"dc:date.accessioned":["2022-11-30T19:39:05Z"],"dc:date.available":["2022-11-30T19:39:05Z"],"dc:date.issued":["2022-05"],"dc:description.abstract":["Many small manufacturers struggle with poor maintenance efficiency, resulting in high maintenance costs and/or frequent equipment breakdowns. Existing literature addresses which tasks to prioritize and how to measure results, but there is little prior work on how to accomplish more maintenance work overall with the same resources and reduce maintenance wastes. We develop a framework for conceptualizing maintenance operational efficiency as a complement to maintenance strategy, focusing on the primary maintenance process: backlog, diagnosis, planning, getting parts, executing, and observing effects. We apply this framework to a small Michigan manufacturing facility. We estimate the cost of equipment breakdowns at the facility using a novel cross-referencing between maintenance breakdowns and production bottlenecks. Finally, we propose several improvements to target wastes in each step of the primary maintenance process: shared ownership of equipment between maintenance and production, more accessible documentation, a work order system, proximal spare parts storage, and solving problems permanently."],"dc:description.degree":["S.M.","M.B.A."],"dc:identifier.uri":["https://hdl.handle.net/1721.1/146651"],"dc:publisher":["Massachusetts Institute of Technology"],"dc:rights":["In Copyright - Educational Use Permitted","Copyright retained by author(s)"],"dc:rights.uri":["https://rightsstatements.org/page/InC-EDU/1.0/"],"dc:title":["Improving Operational Efficiency of a Small Manufacturing Maintenance Organization"],"dc:type":["Thesis"],"thesis:degree_name":["Master","Master of Science in Electrical Engineering and Computer Science","Master of Business Administration"]},"updated_at":"2026-07-22T22:22:31Z"}