Back to results

Massachusetts Institute of Technology

Predictive analysis of installation and operational qualification issues vs. process severity events

Abstract

dc:description.abstract

As the retail industry grows more popular, ABCD, a world-class electronic commerce (e-commerce) business, is increasingly building new Fulfillment Centers (FCs) to support this rapid demand growth. It is integral for ABCD to validate the installation quality and functionality of Material Handling Equipment (MHE) in these newly built FCs so operations can avoid errors. To achieve this objective, ABCD introduced the Installation and Operational Qualification (IOQ) process in late 2014. While the IOQ process reduces early operational failures, it does not completely eliminate them. Inadequate IOQ and tighter installation timelines are leading to degraded installation quality, resulting in operational issues and costs for ABCD. As the FC network continues to grow, there is a need to improve installation quality to reduce early operational issues and enhance the FC start-up experience.

Degree

thesis:*
Name thesis:degree_name
Master
Department dc:contributor.department
Sloan School of Management
Grantor dc:publisher
Massachusetts Institute of Technology
Year dc:date.issued
2020

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Poudyal, Bidusha.
Advisor dc:contributor.advisor
  • Duane S. Boning and Negin (Nicki) Golrezaei.

Subjects

dc:subject × 3

Rights

dc:rights
Statement dc:rights
  • MIT theses may be protected by copyright. Please reuse MIT thesis content according to the MIT Libraries Permissions Policy, which is available through the URL provided.
Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/1721.1/126913
OAI identifier oai:identifier
oai:dspace.mit.edu:1721.1/126913

Chain of custody

source
Harvested from
MIT
Base URL
dspace.mit.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Poudyal, Bidusha.. Predictive analysis of installation and operational qualification issues vs. process severity events. Massachusetts Institute of Technology, 2020. https://hdl.handle.net/1721.1/126913