Back to results

Massachusetts Institute of Technology

On-time delivery improvement at a semiconductor equipment manufacturing facility : developing robust work plan to improve resources utilization and shorten production cycle time/

Abstract

dc:description.abstract

The boost of the need in semiconductor equipment has brought Varian, a giant in semiconductor manufacturer an increasing demand period. Unsatisfactory on-time delivery in the subassembly production in SMKT, however, has gradually become a critical issue that prevents the production from operating smoothly and efficiently as well as resulting in significant amount of extra financial costs. While the SMKT ontime delivery is generally improved from the two aspects, the material shortage issue and the capacity and priority issue, the second approach was focused, analyzed and well resolved in this thesis. Capacity analysis indicates that more manpower is needed to fulfill the production demand, and an analysis tool based on Excel was created to help with capacity management and planning in a long term. A series of matching algorithms was designed to solve the prioritization issue by providing efficient work plans that direct the production in SMKT assembly process, improving the SMKT on-time delivery by 10-20% and shortening the shop order cycle time in assembly process by one day. Moreover, recommendations on data utilization, capacity management and resources management in SMKT are provided accordingly to optimize the SMKT production to be more proficient and well-organized, which will greatly benefit Varian in the long term. The implementation of this algorithm generates no financial cost except for increasing the assembler's capacity, which indicates that all solutions provided in this thesis are economic and effective at the same time.

Degree

thesis:*
Department dc:contributor.department
Massachusetts Institute of Technology. Department of Mechanical Engineering.
Grantor dc:publisher
Massachusetts Institute of Technology
Year dc:date.issued
2017

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Xu, Zongying, M. Eng. Massachusetts Institute of Technology
Advisor dc:contributor.advisor
  • Stanley B. Gershwin.

Subjects

dc:subject × 1

Rights

dc:rights
Statement dc:rights
  • MIT theses are protected by copyright. They may be viewed, downloaded, or printed from this source but further reproduction or distribution in any format is prohibited without written permission.
Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/1721.1/113729
OAI identifier oai:identifier
oai:dspace.mit.edu:1721.1/113729

Chain of custody

source
Harvested from
MIT
Base URL
dspace.mit.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Xu, Zongying, M. Eng. Massachusetts Institute of Technology. On-time delivery improvement at a semiconductor equipment manufacturing facility : developing robust work plan to improve resources utilization and shorten production cycle time/. Massachusetts Institute of Technology, 2017. http://hdl.handle.net/1721.1/113729