{"id":{"repo_id":"mit","oai_identifier":"oai:dspace.mit.edu:1721.1/112859"},"canonical_url":"https://search.dev.ndltd.org/etd/mit/oai:dspace.mit.edu:1721.1/112859","repository":{"repo_id":"mit","name":"MIT","base_url":"https://dspace.mit.edu/oai/request"},"display":{"title":"Identifying inventory excess and service risk in medical devices : a simulation approach","abstract":"Medical devices companies struggle to balance between inventory and service performance, as the products are non-interchangeable and inventory investment is expensive. To find the right level of inventory, we first used unsupervised clustering method to find demand pattern uncertainty for each product. Then, we developed a simulation-based approach to determine the required inventory to achieve a required service level guarantee. We further explored policy changes in the demand fulfillment process to identify how the company can effectively improve performance without increasing inventory level. After comparing different results, we concluded that reduction of replenishment lead time is the most effective measure. The methodology can be applied to a wide range of products and sectors.","abstract_html":"Medical devices companies struggle to balance between inventory and service performance, as the products are non-interchangeable and inventory investment is expensive. To find the right level of inventory, we first used unsupervised clustering method to find demand pattern uncertainty for each product. Then, we developed a simulation-based approach to determine the required inventory to achieve a required service level guarantee. We further explored policy changes in the demand fulfillment process to identify how the company can effectively improve performance without increasing inventory level. After comparing different results, we concluded that reduction of replenishment lead time is the most effective measure. The methodology can be applied to a wide range of products and sectors.","abstract_has_math":false,"creators":["Rey, Maria (Maria de los Santos)","Xu, Xiaofan"],"institution":"Massachusetts Institute of Technology","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":"Massachusetts Institute of Technology. Supply Chain Management Program.","school":null,"contributors":[],"advisors":["Omar Sherif Elwakil."],"committee_chairs":[],"committee_members":[],"year":2017,"date_issued":"2017","date_published":"2017","updated_at":"2026-07-22T22:21:55Z","subjects":["Supply Chain Management Program."],"languages":["eng"],"rights":["MIT theses are protected by copyright. They may be viewed, downloaded, or printed from this source but further reproduction or distribution in any format is prohibited without written permission."],"rights_urls":["http://dspace.mit.edu/handle/1721.1/7582"],"identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/1721.1/112859","outbound_label":"Handle","outbound_source":"dc:identifier.uri"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Omar Sherif Elwakil."]},{"key":"dc:contributor.department","label":"Department","values":["Massachusetts Institute of Technology. Supply Chain Management Program."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Massachusetts Institute of Technology. Supply Chain Management Program."]},{"key":"dc:creator","label":"Author","values":["Rey, Maria (Maria de los Santos)","Xu, Xiaofan"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2017-12-20T18:15:05Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2017-12-20T18:15:05Z"]},{"key":"dc:date.issued","label":"Date","values":["2017"]},{"key":"dc:publisher","label":"Institution","values":["Massachusetts Institute of Technology"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Supply Chain Management Program."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["eng"]},{"key":"dc:rights","label":"Dc Rights","values":["MIT theses are protected by copyright. They may be viewed, downloaded, or printed from this source but further reproduction or distribution in any format is prohibited without written permission."]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://dspace.mit.edu/handle/1721.1/7582"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1721.1/112859"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["Thesis: M. Eng. in Supply Chain Management, Massachusetts Institute of Technology, Supply Chain Management Program, 2017.","Cataloged from PDF version of thesis.","Includes bibliographical references (pages 81-82)."]},{"key":"dc:description.abstract","label":"Abstract","values":["Medical devices companies struggle to balance between inventory and service performance, as the products are non-interchangeable and inventory investment is expensive. To find the right level of inventory, we first used unsupervised clustering method to find demand pattern uncertainty for each product. Then, we developed a simulation-based approach to determine the required inventory to achieve a required service level guarantee. We further explored policy changes in the demand fulfillment process to identify how the company can effectively improve performance without increasing inventory level. After comparing different results, we concluded that reduction of replenishment lead time is the most effective measure. The methodology can be applied to a wide range of products and sectors."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["M. Eng. in Supply Chain Management"]},{"key":"dc:title","label":"Title","values":["Identifying inventory excess and service risk in medical devices : a simulation approach"]}]}],"canonical_facts":{"dc:contributor.advisor":["Omar Sherif Elwakil."],"dc:contributor.department":["Massachusetts Institute of Technology. Supply Chain Management Program."],"dc:contributor.other":["Massachusetts Institute of Technology. Supply Chain Management Program."],"dc:creator":["Rey, Maria (Maria de los Santos)","Xu, Xiaofan"],"dc:date.accessioned":["2017-12-20T18:15:05Z"],"dc:date.available":["2017-12-20T18:15:05Z"],"dc:date.issued":["2017"],"dc:description":["Thesis: M. Eng. in Supply Chain Management, Massachusetts Institute of Technology, Supply Chain Management Program, 2017.","Cataloged from PDF version of thesis.","Includes bibliographical references (pages 81-82)."],"dc:description.abstract":["Medical devices companies struggle to balance between inventory and service performance, as the products are non-interchangeable and inventory investment is expensive. To find the right level of inventory, we first used unsupervised clustering method to find demand pattern uncertainty for each product. Then, we developed a simulation-based approach to determine the required inventory to achieve a required service level guarantee. We further explored policy changes in the demand fulfillment process to identify how the company can effectively improve performance without increasing inventory level. After comparing different results, we concluded that reduction of replenishment lead time is the most effective measure. The methodology can be applied to a wide range of products and sectors."],"dc:description.degree":["M. Eng. in Supply Chain Management"],"dc:identifier.uri":["http://hdl.handle.net/1721.1/112859"],"dc:language.iso":["eng"],"dc:publisher":["Massachusetts Institute of Technology"],"dc:rights":["MIT theses are protected by copyright. They may be viewed, downloaded, or printed from this source but further reproduction or distribution in any format is prohibited without written permission."],"dc:rights.uri":["http://dspace.mit.edu/handle/1721.1/7582"],"dc:subject":["Supply Chain Management Program."],"dc:title":["Identifying inventory excess and service risk in medical devices : a simulation approach"],"dc:type":["Thesis"]},"updated_at":"2026-07-22T22:21:55Z"}