{"id":{"repo_id":"mit","oai_identifier":"oai:dspace.mit.edu:1721.1/112854"},"canonical_url":"https://search.dev.ndltd.org/etd/mit/oai:dspace.mit.edu:1721.1/112854","repository":{"repo_id":"mit","name":"MIT","base_url":"https://dspace.mit.edu/oai/request"},"display":{"title":"A generalized framework for optimization with risk","abstract":"Supply chains are facing increasingly volatile environments. Traditional optimization solutions provide a baseline understanding for industry applications, but cost-efficient solutions require a more robust approach. In high-tech capital construction projects, the construction of facilities requires complex project schedules, forecast well in advance. These forecasts are used to hire contract workers of varying contract lengths. In this thesis, we develop a risk integration methodology for contract workforce hiring optimization, and explore the capability of generalizing this approach for other supply chain problems. We first create a risk-integrated, optimal solution for workforce hiring that strategically covers areas of high risk density in construction forecasts. We first develop a program to simulate schedule variations based on the associated risk parameters of the scheduled tasks. Using the risk statistics resulting from these simulated schedules, we build new schedule requirements using two different methods. The first method addresses the gap from a daily perspective (bottom-up), while the second method addresses it from an overall schedule perspective (top-down). These new requirements are each overlaid on the input schedule, re-optimized, and excess daily coverage is trimmed. Using both methods, we found that higher levels of risk coverage were achieved at lower costs than the traditional solutions. In the studied case for Intel, a 23% additional risk coverage was generated for equivalent cost. Ultimately, the results show that strategic risk integration can result in a lower final cost, and a generalized framework for risk integration can be applied across many supply chain problems.","abstract_html":"Supply chains are facing increasingly volatile environments. Traditional optimization solutions provide a baseline understanding for industry applications, but cost-efficient solutions require a more robust approach. In high-tech capital construction projects, the construction of facilities requires complex project schedules, forecast well in advance. These forecasts are used to hire contract workers of varying contract lengths. In this thesis, we develop a risk integration methodology for contract workforce hiring optimization, and explore the capability of generalizing this approach for other supply chain problems. We first create a risk-integrated, optimal solution for workforce hiring that strategically covers areas of high risk density in construction forecasts. We first develop a program to simulate schedule variations based on the associated risk parameters of the scheduled tasks. Using the risk statistics resulting from these simulated schedules, we build new schedule requirements using two different methods. The first method addresses the gap from a daily perspective (bottom-up), while the second method addresses it from an overall schedule perspective (top-down). These new requirements are each overlaid on the input schedule, re-optimized, and excess daily coverage is trimmed. Using both methods, we found that higher levels of risk coverage were achieved at lower costs than the traditional solutions. In the studied case for Intel, a 23% additional risk coverage was generated for equivalent cost. Ultimately, the results show that strategic risk integration can result in a lower final cost, and a generalized framework for risk integration can be applied across many supply chain problems.","abstract_has_math":false,"creators":["Zipperer, Damaris R","Brown, Andrew N"],"institution":"Massachusetts Institute of Technology","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":"Massachusetts Institute of Technology. Supply Chain Management Program.","school":null,"contributors":[],"advisors":["Sergio A. Caballero."],"committee_chairs":[],"committee_members":[],"year":2017,"date_issued":"2017","date_published":"2017","updated_at":"2026-07-22T22:21:19Z","subjects":["Supply Chain Management Program."],"languages":["eng"],"rights":["MIT theses are protected by copyright. They may be viewed, downloaded, or printed from this source but further reproduction or distribution in any format is prohibited without written permission."],"rights_urls":["http://dspace.mit.edu/handle/1721.1/7582"],"identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/1721.1/112854","outbound_label":"Handle","outbound_source":"dc:identifier.uri"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Sergio A. Caballero."]},{"key":"dc:contributor.department","label":"Department","values":["Massachusetts Institute of Technology. Supply Chain Management Program."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Massachusetts Institute of Technology. Supply Chain Management Program."]},{"key":"dc:creator","label":"Author","values":["Zipperer, Damaris R","Brown, Andrew N"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2017-12-20T18:14:52Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2017-12-20T18:14:52Z"]},{"key":"dc:date.issued","label":"Date","values":["2017"]},{"key":"dc:publisher","label":"Institution","values":["Massachusetts Institute of Technology"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Supply Chain Management Program."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["eng"]},{"key":"dc:rights","label":"Dc Rights","values":["MIT theses are protected by copyright. They may be viewed, downloaded, or printed from this source but further reproduction or distribution in any format is prohibited without written permission."]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://dspace.mit.edu/handle/1721.1/7582"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1721.1/112854"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["Thesis: M. Eng. in Supply Chain Management, Massachusetts Institute of Technology, Supply Chain Management Program, 2017.","Cataloged from PDF version of thesis.","Includes bibliographical references (pages 51-52)."]},{"key":"dc:description.abstract","label":"Abstract","values":["Supply chains are facing increasingly volatile environments. Traditional optimization solutions provide a baseline understanding for industry applications, but cost-efficient solutions require a more robust approach. In high-tech capital construction projects, the construction of facilities requires complex project schedules, forecast well in advance. These forecasts are used to hire contract workers of varying contract lengths. In this thesis, we develop a risk integration methodology for contract workforce hiring optimization, and explore the capability of generalizing this approach for other supply chain problems. We first create a risk-integrated, optimal solution for workforce hiring that strategically covers areas of high risk density in construction forecasts. We first develop a program to simulate schedule variations based on the associated risk parameters of the scheduled tasks. Using the risk statistics resulting from these simulated schedules, we build new schedule requirements using two different methods. The first method addresses the gap from a daily perspective (bottom-up), while the second method addresses it from an overall schedule perspective (top-down). These new requirements are each overlaid on the input schedule, re-optimized, and excess daily coverage is trimmed. Using both methods, we found that higher levels of risk coverage were achieved at lower costs than the traditional solutions. In the studied case for Intel, a 23% additional risk coverage was generated for equivalent cost. Ultimately, the results show that strategic risk integration can result in a lower final cost, and a generalized framework for risk integration can be applied across many supply chain problems."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["M. Eng. in Supply Chain Management"]},{"key":"dc:title","label":"Title","values":["A generalized framework for optimization with risk"]}]}],"canonical_facts":{"dc:contributor.advisor":["Sergio A. Caballero."],"dc:contributor.department":["Massachusetts Institute of Technology. Supply Chain Management Program."],"dc:contributor.other":["Massachusetts Institute of Technology. Supply Chain Management Program."],"dc:creator":["Zipperer, Damaris R","Brown, Andrew N"],"dc:date.accessioned":["2017-12-20T18:14:52Z"],"dc:date.available":["2017-12-20T18:14:52Z"],"dc:date.issued":["2017"],"dc:description":["Thesis: M. Eng. in Supply Chain Management, Massachusetts Institute of Technology, Supply Chain Management Program, 2017.","Cataloged from PDF version of thesis.","Includes bibliographical references (pages 51-52)."],"dc:description.abstract":["Supply chains are facing increasingly volatile environments. Traditional optimization solutions provide a baseline understanding for industry applications, but cost-efficient solutions require a more robust approach. In high-tech capital construction projects, the construction of facilities requires complex project schedules, forecast well in advance. These forecasts are used to hire contract workers of varying contract lengths. In this thesis, we develop a risk integration methodology for contract workforce hiring optimization, and explore the capability of generalizing this approach for other supply chain problems. We first create a risk-integrated, optimal solution for workforce hiring that strategically covers areas of high risk density in construction forecasts. We first develop a program to simulate schedule variations based on the associated risk parameters of the scheduled tasks. Using the risk statistics resulting from these simulated schedules, we build new schedule requirements using two different methods. The first method addresses the gap from a daily perspective (bottom-up), while the second method addresses it from an overall schedule perspective (top-down). These new requirements are each overlaid on the input schedule, re-optimized, and excess daily coverage is trimmed. Using both methods, we found that higher levels of risk coverage were achieved at lower costs than the traditional solutions. In the studied case for Intel, a 23% additional risk coverage was generated for equivalent cost. Ultimately, the results show that strategic risk integration can result in a lower final cost, and a generalized framework for risk integration can be applied across many supply chain problems."],"dc:description.degree":["M. Eng. in Supply Chain Management"],"dc:identifier.uri":["http://hdl.handle.net/1721.1/112854"],"dc:language.iso":["eng"],"dc:publisher":["Massachusetts Institute of Technology"],"dc:rights":["MIT theses are protected by copyright. They may be viewed, downloaded, or printed from this source but further reproduction or distribution in any format is prohibited without written permission."],"dc:rights.uri":["http://dspace.mit.edu/handle/1721.1/7582"],"dc:subject":["Supply Chain Management Program."],"dc:title":["A generalized framework for optimization with risk"],"dc:type":["Thesis"]},"updated_at":"2026-07-22T22:21:19Z"}