Strategies for meeting future capacity needs on the light rail MBTA Green Line

Abstract

dc:description.abstract

The MBTA Green Line in the Boston metropolitan area is the busiest light rail system in the United States. Aging infrastructure and vehicles, a soon-to-be-constructed line extension, and the potential for 40% ridership growth by mid-century will tax already inconsistent service. But in this challenge lies opportunity: a potential full-fleet replacement and accompanying infrastructure upgrades would remove constraints which have long affected operations and vehicle selection. Service evaluation and operations planning including frequency assignment, scheduled setting, and vehicle allocation are relatively well-understood problems for simple public transit lines. However, complex systems like the Green Line - those with multiple overlapping service patterns or branches sharing a trunkline - often present a transit planner with multiple tradeoffs and difficult decisions. Similarly, selection of appropriate rolling stock to help meet increasing capacity requirements is more difficult on a legacy system with physical constraints. Detailed analysis of various automated data collection sources can be used to assist medium-term and long-term planning decisions for these complex systems. This thesis offers a sequential approach to improving the Green Line in that context. Analysis before and after schedule changes in spring 2016 (including the removal of three-car trains) shows that overall capacity increased and passenger waiting times decreased. However, this is largely the partial reversal of service deterioration since 2010, rather than significant longterm improvement. The development of a linear optimization model for determining service frequency and vehicle allocation provides a method to incorporate observational data into evaluation of alternate service scenarios. Analysis of potential rolling stock models based on capacity and physical characteristics indicates that current light rail product lines from four manufacturers can be viable for future Green Line use, although some modifications and infrastructure upgrades will be necessary to meet long-term capacity needs. Although the specific details of this case study are particular to the Green Line, the process should be broadly applicable to other complex branched transit systems.

Degree

thesis:*
Department dc:contributor.department
Massachusetts Institute of Technology. Department of Civil and Environmental Engineering.
Grantor dc:publisher
Massachusetts Institute of Technology
Year dc:date.issued
2017

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Sindel, David A
Advisor dc:contributor.advisor
  • John P. Attanucci and Frederick Salvucci.

Subjects

dc:subject × 1

Rights

dc:rights
Statement dc:rights
  • MIT theses are protected by copyright. They may be viewed, downloaded, or printed from this source but further reproduction or distribution in any format is prohibited without written permission.
Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/1721.1/111263
OAI identifier oai:identifier
oai:dspace.mit.edu:1721.1/111263

Chain of custody

source
Harvested from
MIT
Base URL
dspace.mit.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Sindel, David A. Strategies for meeting future capacity needs on the light rail MBTA Green Line. Massachusetts Institute of Technology, 2017. http://hdl.handle.net/1721.1/111263