Massachusetts Institute of Technology
Wires-down predictive modeling and preventative measures optimization
Abstract
dc:description.abstractIn 2012, the Pacific Gas and Electric Company (PG&E) identified overhead wires-down failure events as an important metric for safety and reliability. These events occur when power lines contact the ground and are caused by a host of reasons including trees falling on wires, animals creating problems, car accidents into poles, or older assets deteriorating and separating. To mitigate these wires-down events, PG&E has a portfolio of preventative measures including tree trimming, routine inspections, and replacement of older assets. This thesis hypothesized that a statistical approach could be used to identify the key drivers in wires-down events and predict future failure locations, thereby helping to direct the preventative measures. In the data aggregation phase of the project, ten datasets describing potential causal factors in wires-down events were integrated into a single database. Key contributions included utilizing clustering analysis to create standardized weather "environments" based on numerous weather factors, and developing an algorithm that used millions of individual tree trimming records to describe the vegetation environment surrounding each line segment. Statistical regressions and machine learning algorithms were then applied to the dataset to model the wires-down events. Out-of-sampling testing determined the best approach, and the predicted timeframe was iteratively rotated to show robustness throughout time. The best results were achieved using logistic regression models. These models predicted hot spot locations of future failures for specific failure modes and provided insight into the key factors that were causing the failures. To implement the models' findings, the discrete line segment failure probabilities were aggregated into sections of line that were several miles in length to calculate cumulative failure ratings. These groupings were the appropriate length for preventative measure projects at PG&E, and allowed PG&E to prioritize their tree trimming and re-conductoring efforts based on the future failure risk. Ultimately, this project simplified decision-making for PG&E experts by focusing their efforts onto a more manageable and perceivable portion of their complex network.
Degree
thesis:*- Department dc:contributor.department
- Leaders for Global Operations Program at MIT
- Grantor dc:publisher
- Massachusetts Institute of Technology
- Year dc:date.issued
- 2016
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Eschelbach, Gregory D
- Advisor dc:contributor.advisor
-
- Georgia Perakis and James Kirtley.
Subjects
dc:subject × 4Rights
dc:rights- Statement dc:rights
-
- M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
- Licence dc:rights.uri
- Language dc:language.iso
- eng
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- http://hdl.handle.net/1721.1/104401
- OAI identifier oai:identifier
- oai:dspace.mit.edu:1721.1/104401