Back to results

University of Maryland

PROJECT MANAGEMENT MATURITY IN THE CONSTRUCTION INDUSTRY OF DEVELOPING COUNTRIES (THE CASE OF ETHIOPIAN CONTRACTORS)

Abstract

dc:description.abstract

This research has studied the maturity of PM in the construction industry of developing countries; in the course, the research has also identified two major gaps in the existing maturity models and, proposed a PM maturity model to address the gaps and adapt it to the developing countries context. Using the model, maturity assessment of contractors in Ethiopia is undertaken and, low level of PM maturity (Informal practice of the basic processes) is found. Further, the research found ISO certified contractors‟ PM maturity to be higher than those which are not. Similarly, the PM maturity of contractors which took part in Capacity Building Program is found to be higher than those which did not take part .Likewise, Road contractors PM maturity is found to be higher than Building contractors. Moreover, the research found higher maturity level for material, procurement, cost, financial, time, and human resource management. Risk and safety management are found to be the least matured PM areas.

Degree

thesis:*
Department dc:contributor.department
Civil Engineering
Year dc:date.issued
2011

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Yimam, Abadir Hassen
Advisor dc:contributor.advisor
  • Skibniewski, Miroslaw J

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/1903/11594
OAI identifier oai:identifier
oai:drum.lib.umd.edu:1903/11594

Chain of custody

source
Harvested from
University of Maryland
Base URL
api.drum.lib.umd.edu/server/oai/request
Last updated
2026-07-24
Source record
OAI-PMH GetRecord
related terms
citation

Yimam, Abadir Hassen. PROJECT MANAGEMENT MATURITY IN THE CONSTRUCTION INDUSTRY OF DEVELOPING COUNTRIES (THE CASE OF ETHIOPIAN CONTRACTORS). 2011. http://hdl.handle.net/1903/11594