{"id":{"repo_id":"lima","oai_identifier":"oai:repositorio.ulima.edu.pe:20.500.12724/11278"},"canonical_url":"https://search.dev.ndltd.org/etd/lima/oai:repositorio.ulima.edu.pe:20.500.12724/11278","repository":{"repo_id":"lima","name":"Universidad de Lima","base_url":"https://repositorio.ulima.edu.pe/oai/request"},"display":{"title":"Estudio de prefactibilidad para la instalación de una planta productora de muebles multifunción de dormitorio, elaborados a base de melamina","abstract":"The present study seeks to apply the tools and concepts used in the industrial engineering career for the implementation of a bedroom furniture production plant. This product has as a target market in Metropolitan Lima, addressing the socioeconomic levels B and C1,. Also, it is segmented according to age range to people from 18 to 55 years. The product is sold unarmed at a price of S / .1 203.60, which includes installation and shipping. The plant is located in the Villa el Salvador district in the province of Metropolitan Lima. A maximum production capacity of 5,243 units was determined, the bottleneck being the stage of the drilling process, in addition to having a semi-automatic production process. Regarding the financial and economic analysis, an investment of 1 008 629 soles was determined, in which 60% corresponds to external financing by a banking entity. A financial NPV of 944,102 soles, a financial IRR of 74% and a cost benefit value equal to 3.34 soles were estimated in the project's life horizon corresponding to 6 years, in addition to an estimated investment recovery period of 2 years, 7 months and 2 days, demonstrating the financial viability of the project. Finally, a positive effect on the contribution to society is determined since an aggregate value of 6,529,182.40 soles and a capital density of 18,678.31 soles / employment is generated.","abstract_html":"The present study seeks to apply the tools and concepts used in the industrial engineering career for the implementation of a bedroom furniture production plant. This product has as a target market in Metropolitan Lima, addressing the socioeconomic levels B and C1,. Also, it is segmented according to age range to people from 18 to 55 years. The product is sold unarmed at a price of S / .1 203.60, which includes installation and shipping. The plant is located in the Villa el Salvador district in the province of Metropolitan Lima. A maximum production capacity of 5,243 units was determined, the bottleneck being the stage of the drilling process, in addition to having a semi-automatic production process. Regarding the financial and economic analysis, an investment of 1 008 629 soles was determined, in which 60% corresponds to external financing by a banking entity. A financial NPV of 944,102 soles, a financial IRR of 74% and a cost benefit value equal to 3.34 soles were estimated in the project&#x27;s life horizon corresponding to 6 years, in addition to an estimated investment recovery period of 2 years, 7 months and 2 days, demonstrating the financial viability of the project. Finally, a positive effect on the contribution to society is determined since an aggregate value of 6,529,182.40 soles and a capital density of 18,678.31 soles / employment is generated.","abstract_has_math":false,"creators":["Arenas Martos, Natali"],"institution":"Universidad de Lima","degree_name":"Ingeniero Industrial","degree_level":"Título Profesional","degree_discipline":"Ingeniería Industrial","degree_department":null,"school":null,"contributors":[],"advisors":["Almandoz Núñez, Ana María"],"committee_chairs":[],"committee_members":[],"year":2019,"date_issued":"2019","date_published":"2019","updated_at":"2026-07-24T02:50:18Z","subjects":["Furniture","Furniture industry","Particle board","Industrial projects","Muebles","Industria del mueble","Proyectos industriales","Tableros aglomerados"],"languages":["spa"],"rights":["info:eu-repo/semantics/openAccess"],"rights_urls":["https://creativecommons.org/licenses/by-nc-sa/4.0/"],"identifier_entries":[{"key":"dc:identifier.doi","label":"DOI","values":["http://doi.org/10.26439/ulima.tesis/11278"],"render_values":[{"text":"http://doi.org/10.26439/ulima.tesis/11278","href":"http://doi.org/10.26439/ulima.tesis/11278","code":true}]}]},"links":{"outbound_url":"https://hdl.handle.net/20.500.12724/11278","outbound_label":"Handle","outbound_source":"dc:identifier.uri"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Almandoz Núñez, Ana María"]},{"key":"dc:creator","label":"Author","values":["Arenas Martos, Natali"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2020-08-07T13:56:04Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2020-08-07T13:56:04Z"]},{"key":"dc:date.issued","label":"Date","values":["2019"]},{"key":"dc:publisher","label":"Institution","values":["Universidad de Lima"]},{"key":"dc:type","label":"Dc Type","values":["info:eu-repo/semantics/bachelorThesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Ingeniería Industrial"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Título Profesional"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Ingeniero Industrial"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Universidad de Lima. Facultad de Ingeniería y Arquitectura"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Furniture","Furniture industry","Particle board","Industrial projects","Muebles","Industria del mueble","Proyectos industriales","Tableros aglomerados"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["spa"]},{"key":"dc:rights","label":"Dc Rights","values":["info:eu-repo/semantics/openAccess"]},{"key":"dc:rights.uri","label":"Rights URI","values":["https://creativecommons.org/licenses/by-nc-sa/4.0/"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.doi","label":"DOI","values":["http://doi.org/10.26439/ulima.tesis/11278"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/20.500.12724/11278"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The present study seeks to apply the tools and concepts used in the industrial engineering career for the implementation of a bedroom furniture production plant. This product has as a target market in Metropolitan Lima, addressing the socioeconomic levels B and C1,. Also, it is segmented according to age range to people from 18 to 55 years. The product is sold unarmed at a price of S / .1 203.60, which includes installation and shipping. The plant is located in the Villa el Salvador district in the province of Metropolitan Lima. A maximum production capacity of 5,243 units was determined, the bottleneck being the stage of the drilling process, in addition to having a semi-automatic production process. Regarding the financial and economic analysis, an investment of 1 008 629 soles was determined, in which 60% corresponds to external financing by a banking entity. A financial NPV of 944,102 soles, a financial IRR of 74% and a cost benefit value equal to 3.34 soles were estimated in the project's life horizon corresponding to 6 years, in addition to an estimated investment recovery period of 2 years, 7 months and 2 days, demonstrating the financial viability of the project. Finally, a positive effect on the contribution to society is determined since an aggregate value of 6,529,182.40 soles and a capital density of 18,678.31 soles / employment is generated.","Se busca con el presente estudio aplicar las herramientas y conceptos obtenidos en la carrera de ingeniería industrial para la implementación de una planta productora de muebles de dormitorio. Este producto tiene como mercado meta a Lima Metropolitana, dirigiéndose a los niveles socioeconómicos B y C1. Asimismo, se segmenta según rango etario a personas desde 18 a 55 años. El producto se comercializa desarmado a un precio de S/.1 203,60, el cual incluye la instalación y envío. Se localizará la planta en el distrito Villa el Salvador en la provincia de Lima Metropolitana. Se determinó una capacidad máxima de producción de 5 243 unidades siendo el cuello de botella la etapa del proceso de perforado, además de contar con un proceso productivo semiautomático. En cuanto al análisis financiero y económico, se determinó una inversión de 1 008 629 soles, en la cual el 60% corresponde a un financiamiento externo por una entidad bancaria. En el horizonte de vida del proyecto que corresponde a 6 años se estimó un VAN financiero de 944,102 soles, un TIR financiero de 74% y un valor beneficio costo igual a 3,34 soles, además de un periodo de recupero de inversión estimado de 2 años, 7 meses y 2 días, demostrando la viabilidad financiera del proyecto. Por último, se determina un efecto positivo en el aporte a la sociedad ya que se genera un valor agregado de 6,529,182.40 soles y una densidad de capital de 18,678.31 soles/empleo."]},{"key":"dc:format","label":"Dc Format","values":["application/pdf"]},{"key":"dc:source","label":"Dc Source","values":["Repositorio Institucional - Ulima","Universidad de Lima"]},{"key":"dc:title","label":"Title","values":["Estudio de prefactibilidad para la instalación de una planta productora de muebles multifunción de dormitorio, elaborados a base de melamina"]}]}],"canonical_facts":{"dc:contributor.advisor":["Almandoz Núñez, Ana María"],"dc:creator":["Arenas Martos, Natali"],"dc:date.accessioned":["2020-08-07T13:56:04Z"],"dc:date.available":["2020-08-07T13:56:04Z"],"dc:date.issued":["2019"],"dc:description.abstract":["The present study seeks to apply the tools and concepts used in the industrial engineering career for the implementation of a bedroom furniture production plant. This product has as a target market in Metropolitan Lima, addressing the socioeconomic levels B and C1,. Also, it is segmented according to age range to people from 18 to 55 years. The product is sold unarmed at a price of S / .1 203.60, which includes installation and shipping. The plant is located in the Villa el Salvador district in the province of Metropolitan Lima. A maximum production capacity of 5,243 units was determined, the bottleneck being the stage of the drilling process, in addition to having a semi-automatic production process. Regarding the financial and economic analysis, an investment of 1 008 629 soles was determined, in which 60% corresponds to external financing by a banking entity. A financial NPV of 944,102 soles, a financial IRR of 74% and a cost benefit value equal to 3.34 soles were estimated in the project's life horizon corresponding to 6 years, in addition to an estimated investment recovery period of 2 years, 7 months and 2 days, demonstrating the financial viability of the project. Finally, a positive effect on the contribution to society is determined since an aggregate value of 6,529,182.40 soles and a capital density of 18,678.31 soles / employment is generated.","Se busca con el presente estudio aplicar las herramientas y conceptos obtenidos en la carrera de ingeniería industrial para la implementación de una planta productora de muebles de dormitorio. Este producto tiene como mercado meta a Lima Metropolitana, dirigiéndose a los niveles socioeconómicos B y C1. Asimismo, se segmenta según rango etario a personas desde 18 a 55 años. El producto se comercializa desarmado a un precio de S/.1 203,60, el cual incluye la instalación y envío. Se localizará la planta en el distrito Villa el Salvador en la provincia de Lima Metropolitana. Se determinó una capacidad máxima de producción de 5 243 unidades siendo el cuello de botella la etapa del proceso de perforado, además de contar con un proceso productivo semiautomático. En cuanto al análisis financiero y económico, se determinó una inversión de 1 008 629 soles, en la cual el 60% corresponde a un financiamiento externo por una entidad bancaria. En el horizonte de vida del proyecto que corresponde a 6 años se estimó un VAN financiero de 944,102 soles, un TIR financiero de 74% y un valor beneficio costo igual a 3,34 soles, además de un periodo de recupero de inversión estimado de 2 años, 7 meses y 2 días, demostrando la viabilidad financiera del proyecto. Por último, se determina un efecto positivo en el aporte a la sociedad ya que se genera un valor agregado de 6,529,182.40 soles y una densidad de capital de 18,678.31 soles/empleo."],"dc:format":["application/pdf"],"dc:identifier.doi":["http://doi.org/10.26439/ulima.tesis/11278"],"dc:identifier.uri":["https://hdl.handle.net/20.500.12724/11278"],"dc:language.iso":["spa"],"dc:publisher":["Universidad de Lima"],"dc:rights":["info:eu-repo/semantics/openAccess"],"dc:rights.uri":["https://creativecommons.org/licenses/by-nc-sa/4.0/"],"dc:source":["Repositorio Institucional - Ulima","Universidad de Lima"],"dc:subject":["Furniture","Furniture industry","Particle board","Industrial projects","Muebles","Industria del mueble","Proyectos industriales","Tableros aglomerados"],"dc:title":["Estudio de prefactibilidad para la instalación de una planta productora de muebles multifunción de dormitorio, elaborados a base de melamina"],"dc:type":["info:eu-repo/semantics/bachelorThesis"],"thesis:degree_discipline":["Ingeniería Industrial"],"thesis:degree_level":["Título Profesional"],"thesis:degree_name":["Ingeniero Industrial"],"thesis:institution_name":["Universidad de Lima. Facultad de Ingeniería y Arquitectura"]},"updated_at":"2026-07-24T02:50:18Z"}