{"id":{"repo_id":"lima","oai_identifier":"oai:repositorio.ulima.edu.pe:20.500.12724/10544"},"canonical_url":"https://search.dev.ndltd.org/etd/lima/oai:repositorio.ulima.edu.pe:20.500.12724/10544","repository":{"repo_id":"lima","name":"Universidad de Lima","base_url":"https://repositorio.ulima.edu.pe/oai/request"},"display":{"title":"Mejora en el gasoducto del PERÚ LNG utilizando herramientas de ingeniería industrial","abstract":"This document details the assessment process of the Project to upgrade the capacity of the filtering unit at the metering station of PERU LNG S.R.L.’s natural gas pipeline using Industrial Engineering tools. The project initiates after a request to provide additional transportation capacity through PERU LNG S.R.L.’s natural gas pipeline was received to supply the local market and it was approved by upper management. Through the utilization of a cause-effect diagram it was identified that the capacity of the existing facilities along the pipeline shall be assessed to identify possible bottle necks that could impact the transportation capacity of the pipeline.","abstract_html":"This document details the assessment process of the Project to upgrade the capacity of the filtering unit at the metering station of PERU LNG S.R.L.’s natural gas pipeline using Industrial Engineering tools. The project initiates after a request to provide additional transportation capacity through PERU LNG S.R.L.’s natural gas pipeline was received to supply the local market and it was approved by upper management. Through the utilization of a cause-effect diagram it was identified that the capacity of the existing facilities along the pipeline shall be assessed to identify possible bottle necks that could impact the transportation capacity of the pipeline.","abstract_has_math":false,"creators":["Saez Loo, Luis Victoriano"],"institution":"Universidad de Lima","degree_name":"Ingeniero Industrial","degree_level":"Título Profesional","degree_discipline":"Ingeniería Industrial","degree_department":null,"school":null,"contributors":[],"advisors":["Valdez Ampuero, Ana Elizabeth"],"committee_chairs":[],"committee_members":[],"year":2019,"date_issued":"2019","date_published":"2019","updated_at":"2026-07-24T02:49:59Z","subjects":["Gasoductos","Evaluación de proyectos","Gas pipelines","Project evaluation"],"languages":["spa"],"rights":["info:eu-repo/semantics/openAccess"],"rights_urls":["https://creativecommons.org/licenses/by-nc-sa/4.0/"],"identifier_entries":[{"key":"dc:identifier.doi","label":"DOI","values":["http://doi.org/10.26439/ulima.tesis/10544"],"render_values":[{"text":"http://doi.org/10.26439/ulima.tesis/10544","href":"http://doi.org/10.26439/ulima.tesis/10544","code":true}]}]},"links":{"outbound_url":"https://hdl.handle.net/20.500.12724/10544","outbound_label":"Handle","outbound_source":"dc:identifier.uri"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Valdez Ampuero, Ana Elizabeth"]},{"key":"dc:creator","label":"Author","values":["Saez Loo, Luis Victoriano"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2020-03-06T17:01:06Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2020-03-06T17:01:06Z"]},{"key":"dc:date.issued","label":"Date","values":["2019"]},{"key":"dc:publisher","label":"Institution","values":["Universidad de Lima"]},{"key":"dc:type","label":"Dc Type","values":["info:eu-repo/semantics/bachelorThesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Ingeniería Industrial"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Título Profesional"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Ingeniero Industrial"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Universidad de Lima. Facultad de Ingeniería y Arquitectura"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Gasoductos","Evaluación de proyectos","Gas pipelines","Project evaluation"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["spa"]},{"key":"dc:rights","label":"Dc Rights","values":["info:eu-repo/semantics/openAccess"]},{"key":"dc:rights.uri","label":"Rights URI","values":["https://creativecommons.org/licenses/by-nc-sa/4.0/"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.doi","label":"DOI","values":["http://doi.org/10.26439/ulima.tesis/10544"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/20.500.12724/10544"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This document details the assessment process of the Project to upgrade the capacity of the filtering unit at the metering station of PERU LNG S.R.L.’s natural gas pipeline using Industrial Engineering tools. The project initiates after a request to provide additional transportation capacity through PERU LNG S.R.L.’s natural gas pipeline was received to supply the local market and it was approved by upper management. Through the utilization of a cause-effect diagram it was identified that the capacity of the existing facilities along the pipeline shall be assessed to identify possible bottle necks that could impact the transportation capacity of the pipeline.","El presente trabajo cubre el proceso de evaluación del proyecto de ampliación de la unidad de filtración de la estación de medición del gasoducto de PERU LNG S.R.L. utilizando herramientas de Ingeniería Industrial. El proyecto se origina ante el requerimiento de proveer capacidad de transporte adicional de gas natural en el gasoducto de PERU LNG S.R.L. para el mercado local, el cual fue dispuesto por la alta dirección de la empresa. Mediante la utilización de un diagrama causa-efecto se identificó que la capacidad de las unidades instaladas a lo largo del ducto debía ser analizada para identificar posibles cuellos de botella que impacten la capacidad de transporte del ducto."]},{"key":"dc:format","label":"Dc Format","values":["application/pdf"]},{"key":"dc:source","label":"Dc Source","values":["Repositorio Institucional - Ulima","Universidad de Lima"]},{"key":"dc:title","label":"Title","values":["Mejora en el gasoducto del PERÚ LNG utilizando herramientas de ingeniería industrial"]}]}],"canonical_facts":{"dc:contributor.advisor":["Valdez Ampuero, Ana Elizabeth"],"dc:creator":["Saez Loo, Luis Victoriano"],"dc:date.accessioned":["2020-03-06T17:01:06Z"],"dc:date.available":["2020-03-06T17:01:06Z"],"dc:date.issued":["2019"],"dc:description.abstract":["This document details the assessment process of the Project to upgrade the capacity of the filtering unit at the metering station of PERU LNG S.R.L.’s natural gas pipeline using Industrial Engineering tools. The project initiates after a request to provide additional transportation capacity through PERU LNG S.R.L.’s natural gas pipeline was received to supply the local market and it was approved by upper management. Through the utilization of a cause-effect diagram it was identified that the capacity of the existing facilities along the pipeline shall be assessed to identify possible bottle necks that could impact the transportation capacity of the pipeline.","El presente trabajo cubre el proceso de evaluación del proyecto de ampliación de la unidad de filtración de la estación de medición del gasoducto de PERU LNG S.R.L. utilizando herramientas de Ingeniería Industrial. El proyecto se origina ante el requerimiento de proveer capacidad de transporte adicional de gas natural en el gasoducto de PERU LNG S.R.L. para el mercado local, el cual fue dispuesto por la alta dirección de la empresa. Mediante la utilización de un diagrama causa-efecto se identificó que la capacidad de las unidades instaladas a lo largo del ducto debía ser analizada para identificar posibles cuellos de botella que impacten la capacidad de transporte del ducto."],"dc:format":["application/pdf"],"dc:identifier.doi":["http://doi.org/10.26439/ulima.tesis/10544"],"dc:identifier.uri":["https://hdl.handle.net/20.500.12724/10544"],"dc:language.iso":["spa"],"dc:publisher":["Universidad de Lima"],"dc:rights":["info:eu-repo/semantics/openAccess"],"dc:rights.uri":["https://creativecommons.org/licenses/by-nc-sa/4.0/"],"dc:source":["Repositorio Institucional - Ulima","Universidad de Lima"],"dc:subject":["Gasoductos","Evaluación de proyectos","Gas pipelines","Project evaluation"],"dc:title":["Mejora en el gasoducto del PERÚ LNG utilizando herramientas de ingeniería industrial"],"dc:type":["info:eu-repo/semantics/bachelorThesis"],"thesis:degree_discipline":["Ingeniería Industrial"],"thesis:degree_level":["Título Profesional"],"thesis:degree_name":["Ingeniero Industrial"],"thesis:institution_name":["Universidad de Lima. Facultad de Ingeniería y Arquitectura"]},"updated_at":"2026-07-24T02:49:59Z"}