Back to results

University of Houston

A Comprehensive Methodology For Well Ramp-up of Open Hole Stand-Alone Screen Completions

Abstract

dc:description.abstract

Following the unloading of completion fluids, wells face the most critical step of ramping up production toward a peak rate for the first time. The challenge is delivering the maximum rate with limited well performance information and without damaging the completion integrity at the same time. This research develops a production surveillance methodology to monitor and ramp-up production for open hole stand-alone screen (OH-SAS) completion that optimizes production by considering risks of production impairment and screen erosion failure. Laboratory evaluations of drill-in fluids showed non-uniform filter cake clean-up or presence of “pinholes” resulting in concentrated inflow around the wellbore. A combination of laboratory return permeability tests, CT scans and a developed reduced order model determines the pinhole size and filter cake properties to calculate the total pinhole flow area or concentrated inflow velocity using an established relationship. The pinhole inflow velocity is distributed into the radial and axial annular flow velocities in the OH-SAS wellbore using a network flow model to assess the screen erosion failure risks from direct impingement and convergence at the top of the screen assembly, respectively. The ramp-up strategy is to use successive PBU data of increasing production rates and evaluate the absolute and relative changes of completion pressure drop and velocities against established failure criteria. The application of filter cake properties and PBU data showed the internal filter cake permeability has the most dominant effect on the inflow velocity. The completion pressure drop as a function of flow rate is non-linear and higher than the case without pinholes. Results from the network model showed that convergent velocity is higher than the impingement velocity. Adding screen above the pay interval reduces the screen impingement erosion risk but increases the annular scouring risk. Scouring velocity is found to be significantly higher than the convergent velocity. This highlights the need to consider screen and borehole failure due to scouring erosion. The convergent velocities for pinhole and non-pinhole cases were similar and the implementation of pinhole in this methodology only affected the completion pressure drop or the completion impairment risk.

Degree

thesis:*
Name thesis:degree_name
Doctor of Philosophy
Level thesis:degree_level
Doctoral
Discipline thesis:degree_discipline
Petroleum Engineering
Grantor
University of Houston
Year dc:date.issued
2020

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Karaaslan, Mehmet Emin
Advisor dc:contributor.advisor
  • Wong, George K.
Committee members dc:contributor.committeemember
  • Soliman, Mohamed Y.
  • Yousif, Majeed
  • Kostarelos, Konstantinos
  • Hathon, Lori A.

Subjects

dc:subject × 7

Rights

dc:rights
Statement dc:rights
  • The author of this work is the copyright owner. UH Libraries and the Texas Digital Library have their permission to store and provide access to this work. Further transmission, reproduction, or presentation of this work is prohibited except with permission of the author(s).
Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10657/6607
OAI identifier oai:identifier
oai:uh-ir.tdl.org:10657/6607

Chain of custody

source
Harvested from
University of Houston
Base URL
uh-ir.tdl.org/server/oai/request
Last updated
2026-07-24
Source record
OAI-PMH GetRecord
citation

Karaaslan, Mehmet Emin. A Comprehensive Methodology For Well Ramp-up of Open Hole Stand-Alone Screen Completions. Doctoral thesis, University of Houston, 2020. https://hdl.handle.net/10657/6607