{"id":{"repo_id":"greece","oai_identifier":"oai:10442/0805"},"canonical_url":"https://search.dev.ndltd.org/etd/greece/oai:10442/0805","repository":{"repo_id":"greece","name":"Greek National Archive of PhD Theses","base_url":"https://phdtheses.ekt.gr/eadd_oai/request"},"display":{"title":"Επίδραση της αξιοπιστίας των μηχανών στον προγραμματισμό δομικών έργων","abstract":"WITH THE CLASSIC METHOD OF NETWORK ANALYSIS WE FIND THE DURATION OF A WORK. IN THIS STUDY WE TAKE INTO CONSIDERATION THE RELIABILITIES OF THE EQUIPMENT OF EACH ACTIVITY USING THE PERT TECHNIQUE. THUS WE INTRODUCE FAILURE PERMUTATIONS, RELIABILITY OF AN OPERATION, LOWER LIMIT OF RELIABILITY, ADMITTED AND NOT ADMITTED FAILURE PERMUTION, EXPECTED EXCEEDED TIME, EXPECTED EXCEEDED COSTS, EXPECTED DIRECT AND EXPECTED INDIRECT COSTS. THESE NOTIONS ARE INCORPORATED INTO ALGORITHM Δ1 WHICH CALCULATE THEM.","abstract_html":"WITH THE CLASSIC METHOD OF NETWORK ANALYSIS WE FIND THE DURATION OF A WORK. IN THIS STUDY WE TAKE INTO CONSIDERATION THE RELIABILITIES OF THE EQUIPMENT OF EACH ACTIVITY USING THE PERT TECHNIQUE. THUS WE INTRODUCE FAILURE PERMUTATIONS, RELIABILITY OF AN OPERATION, LOWER LIMIT OF RELIABILITY, ADMITTED AND NOT ADMITTED FAILURE PERMUTION, EXPECTED EXCEEDED TIME, EXPECTED EXCEEDED COSTS, EXPECTED DIRECT AND EXPECTED INDIRECT COSTS. THESE NOTIONS ARE INCORPORATED INTO ALGORITHM Δ1 WHICH CALCULATE THEM.","abstract_has_math":false,"creators":["Καλφακάκου, Γλυκερία","Kalfakakou, Glykeria"],"institution":"Aristotle University Of Thessaloniki (AUTH)","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":1987,"date_issued":"1987","date_published":"1987","updated_at":"2026-07-24T02:25:27Z","subjects":["Αξιοπιστία","ΔΕΝΔΡΟ ΑΝΙΧΝΕΥΣΗΣ","Διατάξεις","Πιθανότητες","PERMUTATIONS","PERT","PROBABILITIES","Reliability","TREE SEARCH","Επιστήμες Μηχανικού και Τεχνολογία","Επιστήμη Πολιτικού Μηχανικού","Engineering and Technology","Civil Engineering"],"languages":["gre"],"rights":[],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier","label":"Identifier","values":["10.12681/eadd/0805"],"render_values":[{"text":"10.12681/eadd/0805","href":"https://doi.org/10.12681/eadd/0805","code":true}]}]},"links":{"outbound_url":"http://hdl.handle.net/10442/hedi/0805","outbound_label":"Handle","outbound_source":"dc:identifier"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:creator","label":"Author","values":["Καλφακάκου, Γλυκερία","Kalfakakou, Glykeria"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["1987"]},{"key":"dc:publisher","label":"Institution","values":["Aristotle University Of Thessaloniki (AUTH)","Αριστοτέλειο Πανεπιστήμιο Θεσσαλονίκης (ΑΠΘ)"]},{"key":"dc:type","label":"Dc Type","values":["PhD Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Αξιοπιστία","ΔΕΝΔΡΟ ΑΝΙΧΝΕΥΣΗΣ","Διατάξεις","Πιθανότητες","PERMUTATIONS","PERT","PROBABILITIES","Reliability","TREE SEARCH","Επιστήμες Μηχανικού και Τεχνολογία","Επιστήμη Πολιτικού Μηχανικού","Engineering and Technology","Civil Engineering"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["gre"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["10.12681/eadd/0805","http://hdl.handle.net/10442/hedi/0805"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["WITH THE CLASSIC METHOD OF NETWORK ANALYSIS WE FIND THE DURATION OF A WORK. IN THIS STUDY WE TAKE INTO CONSIDERATION THE RELIABILITIES OF THE EQUIPMENT OF EACH ACTIVITY USING THE PERT TECHNIQUE. THUS WE INTRODUCE FAILURE PERMUTATIONS, RELIABILITY OF AN OPERATION, LOWER LIMIT OF RELIABILITY, ADMITTED AND NOT ADMITTED FAILURE PERMUTION, EXPECTED EXCEEDED TIME, EXPECTED EXCEEDED COSTS, EXPECTED DIRECT AND EXPECTED INDIRECT COSTS. THESE NOTIONS ARE INCORPORATED INTO ALGORITHM Δ1 WHICH CALCULATE THEM.","ΜΕ ΤΗΝ ΚΛΑΣΣΙΚΗ ΜΕΘΟΔΟ PERT ΒΡΙΣΚΟΥΜΕ ΤΗ ΔΙΑΡΚΕΙΑ ΚΑΙ ΤΟ ΧΡΟΝΟ ΠΕΡΑΤΩΣΗΣ ΕΝΟΣ ΕΡΓΟΥ. ΣΤΗΝ ΕΡΓΑΣΙΑ ΑΥΤΗ ΛΑΜΒΑΝΟΝΤΑΙ ΥΠΟΨΗ ΚΑΙ ΟΙ ΑΞΙΟΠΙΣΤΙΕΣ ΤΩΝ ΜΗΧΑΝΩΝ ΠΟΥ ΕΡΓΑΖΟΝΤΑΙ ΣΕ ΚΑΘΕ ΔΡΑΣΤΗΡΙΟΤΗΤΑ, ΣΤΗΝ ΔΙΑΔΙΚΑΣΙΑ ΔΙΚΤΥΩΤΗΣ ΑΝΑΛΥΣΗΣ. ΕΙΣΑΓΟΝΤΑΙ ΝΕΕΣ ΕΝΝΟΙΕΣ ΟΠΩΣ ΔΙΑΤΑΞΕΙΣ ΒΛΑΒΩΝ, ΑΞΙΟΠΙΣΤΙΑ ΕΡΓΟΥ, ΚΑΤΩ ΟΡΙΟ ΑΞΙΟΠΙΣΤΙΑΣ, ΕΠΙΤΡΕΠΟΜΕΝΕΣ ΚΑΙ ΜΗ ΕΠΙΤΡΕΠΟΜΕΝΕΣ ΔΙΑΤΑΞΕΙΣ, ΑΝΑΜΕΝΟΜΕΝΟΣ ΧΡΟΝΟΣ ΥΠΕΡΒΑΣΗΣ, ΑΝΑΜΕΝΟΜΕΝΟ ΑΜΕΣΟ ΚΟΣΤΟΣ ΚΑΙ ΑΝΑΜΕΝΟΜΕΝΟ ΕΜΜΕΣΟ ΚΟΣΤΟΣ . ΟΙ ΕΝΝΟΙΕΣ ΑΥΤΕΣ ΥΠΟΛΟΓΙΖΟΝΤΑΙ ΑΠΟ ΕΝΑ ΑΛΓΟΡΙΘΜΟ Δ1 ΠΟΥ ΑΝΑΠΤΥΧΘΗΚΕ ΣΤΗΝ ΕΡΓΑΣΙΑ ΑΥΤΗ."]},{"key":"dc:title","label":"Title","values":["Επίδραση της αξιοπιστίας των μηχανών στον προγραμματισμό δομικών έργων","INFLUATION OF EQUIPMENT RELIABILITY IN PERT"]}]}],"canonical_facts":{"dc:creator":["Καλφακάκου, Γλυκερία","Kalfakakou, Glykeria"],"dc:date":["1987"],"dc:description":["WITH THE CLASSIC METHOD OF NETWORK ANALYSIS WE FIND THE DURATION OF A WORK. IN THIS STUDY WE TAKE INTO CONSIDERATION THE RELIABILITIES OF THE EQUIPMENT OF EACH ACTIVITY USING THE PERT TECHNIQUE. THUS WE INTRODUCE FAILURE PERMUTATIONS, RELIABILITY OF AN OPERATION, LOWER LIMIT OF RELIABILITY, ADMITTED AND NOT ADMITTED FAILURE PERMUTION, EXPECTED EXCEEDED TIME, EXPECTED EXCEEDED COSTS, EXPECTED DIRECT AND EXPECTED INDIRECT COSTS. THESE NOTIONS ARE INCORPORATED INTO ALGORITHM Δ1 WHICH CALCULATE THEM.","ΜΕ ΤΗΝ ΚΛΑΣΣΙΚΗ ΜΕΘΟΔΟ PERT ΒΡΙΣΚΟΥΜΕ ΤΗ ΔΙΑΡΚΕΙΑ ΚΑΙ ΤΟ ΧΡΟΝΟ ΠΕΡΑΤΩΣΗΣ ΕΝΟΣ ΕΡΓΟΥ. ΣΤΗΝ ΕΡΓΑΣΙΑ ΑΥΤΗ ΛΑΜΒΑΝΟΝΤΑΙ ΥΠΟΨΗ ΚΑΙ ΟΙ ΑΞΙΟΠΙΣΤΙΕΣ ΤΩΝ ΜΗΧΑΝΩΝ ΠΟΥ ΕΡΓΑΖΟΝΤΑΙ ΣΕ ΚΑΘΕ ΔΡΑΣΤΗΡΙΟΤΗΤΑ, ΣΤΗΝ ΔΙΑΔΙΚΑΣΙΑ ΔΙΚΤΥΩΤΗΣ ΑΝΑΛΥΣΗΣ. ΕΙΣΑΓΟΝΤΑΙ ΝΕΕΣ ΕΝΝΟΙΕΣ ΟΠΩΣ ΔΙΑΤΑΞΕΙΣ ΒΛΑΒΩΝ, ΑΞΙΟΠΙΣΤΙΑ ΕΡΓΟΥ, ΚΑΤΩ ΟΡΙΟ ΑΞΙΟΠΙΣΤΙΑΣ, ΕΠΙΤΡΕΠΟΜΕΝΕΣ ΚΑΙ ΜΗ ΕΠΙΤΡΕΠΟΜΕΝΕΣ ΔΙΑΤΑΞΕΙΣ, ΑΝΑΜΕΝΟΜΕΝΟΣ ΧΡΟΝΟΣ ΥΠΕΡΒΑΣΗΣ, ΑΝΑΜΕΝΟΜΕΝΟ ΑΜΕΣΟ ΚΟΣΤΟΣ ΚΑΙ ΑΝΑΜΕΝΟΜΕΝΟ ΕΜΜΕΣΟ ΚΟΣΤΟΣ . ΟΙ ΕΝΝΟΙΕΣ ΑΥΤΕΣ ΥΠΟΛΟΓΙΖΟΝΤΑΙ ΑΠΟ ΕΝΑ ΑΛΓΟΡΙΘΜΟ Δ1 ΠΟΥ ΑΝΑΠΤΥΧΘΗΚΕ ΣΤΗΝ ΕΡΓΑΣΙΑ ΑΥΤΗ."],"dc:identifier":["10.12681/eadd/0805","http://hdl.handle.net/10442/hedi/0805"],"dc:language":["gre"],"dc:publisher":["Aristotle University Of Thessaloniki (AUTH)","Αριστοτέλειο Πανεπιστήμιο Θεσσαλονίκης (ΑΠΘ)"],"dc:subject":["Αξιοπιστία","ΔΕΝΔΡΟ ΑΝΙΧΝΕΥΣΗΣ","Διατάξεις","Πιθανότητες","PERMUTATIONS","PERT","PROBABILITIES","Reliability","TREE SEARCH","Επιστήμες Μηχανικού και Τεχνολογία","Επιστήμη Πολιτικού Μηχανικού","Engineering and Technology","Civil Engineering"],"dc:title":["Επίδραση της αξιοπιστίας των μηχανών στον προγραμματισμό δομικών έργων","INFLUATION OF EQUIPMENT RELIABILITY IN PERT"],"dc:type":["PhD Thesis"]},"updated_at":"2026-07-24T02:25:27Z"}