{"id":{"repo_id":"embry-riddle","oai_identifier":"oai:commons.erau.edu:edt-1068"},"canonical_url":"https://search.dev.ndltd.org/etd/embry-riddle/oai:commons.erau.edu:edt-1068","repository":{"repo_id":"embry-riddle","name":"Embry Riddle Aeronautical University","base_url":"https://commons.erau.edu/do/oai/"},"display":{"title":"Determining Kanban Size Using Mathematical Programming and Discrete Event Simulation for a Manufacturing System with Large Production Variability","abstract":"<p>In order to become more competitive and aggressive in the marketplace it is imperative for manufacturers to reduce cycle time, limit work-in-process, and improve productivity, responsiveness, capacities, and quality. One manner in which supply chains can be improved is via the use of kanbans in a pull production system. Kanbans refer to a card or signal for productions scheduling within just-in-time (JIT) production systems to signal where and what to produce, when to produce it, and how much. A Kanban based JIT production system has been shown to be beneficial to supply chains for they reduce work-in-process, provide real time status of the system, and enhance communication both up and down stream.</p> <p>While many studies exist in regards to determining optimal number of kanbans, types of kanban systems, and other factors related to kanban system performance, no comprehensive model has been developed to determine kanban size in a manufacturing system with variable workforce production rate and variable demand pattern. This study used Stewart-Marchman-Act, a Daytona Beach rehabilitation center for those with mental disabilities or recovering from addiction that has several manufacturing processes, as a test bed sing mathematical programming and discrete event simulation models to determine 2 the Kanban size empirically. Results from the validated simulation model indicated that there would be a significant reduction in cycle time with a kanban system; on average, there would be a decrease in cycle time of nine days (almost two weeks). Results were discussed and limitations of the study were presented in the end.</p>","abstract_html":"&lt;p&gt;In order to become more competitive and aggressive in the marketplace it is imperative for manufacturers to reduce cycle time, limit work-in-process, and improve productivity, responsiveness, capacities, and quality. One manner in which supply chains can be improved is via the use of kanbans in a pull production system. Kanbans refer to a card or signal for productions scheduling within just-in-time (JIT) production systems to signal where and what to produce, when to produce it, and how much. A Kanban based JIT production system has been shown to be beneficial to supply chains for they reduce work-in-process, provide real time status of the system, and enhance communication both up and down stream.&lt;/p&gt; &lt;p&gt;While many studies exist in regards to determining optimal number of kanbans, types of kanban systems, and other factors related to kanban system performance, no comprehensive model has been developed to determine kanban size in a manufacturing system with variable workforce production rate and variable demand pattern. This study used Stewart-Marchman-Act, a Daytona Beach rehabilitation center for those with mental disabilities or recovering from addiction that has several manufacturing processes, as a test bed sing mathematical programming and discrete event simulation models to determine 2 the Kanban size empirically. Results from the validated simulation model indicated that there would be a significant reduction in cycle time with a kanban system; on average, there would be a decrease in cycle time of nine days (almost two weeks). Results were discussed and limitations of the study were presented in the end.&lt;/p&gt;","abstract_has_math":false,"creators":["Gaston, Abigail Michele"],"institution":null,"degree_name":"Master of Science in Human Factors & Systems","degree_level":"Thesis - Open Access","degree_discipline":"Human Factors and Systems","degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2012,"date_issued":"2012-04-01T07:00:00Z","date_published":"2012-04-01T07:00:00Z","updated_at":"2026-07-27T19:25:52Z","subjects":["kanban","discrete event simulation","manufacturing systems","production","Industrial Engineering","Psychology"],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[]},"links":{"outbound_url":"https://commons.erau.edu/edt/69","outbound_label":"Repository record","outbound_source":"dc:identifier"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:creator","label":"Author","values":["Gaston, Abigail Michele"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"thesis:degree_discipline","label":"Discipline","values":["Human Factors and Systems"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Thesis - Open Access"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Human Factors & Systems"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["kanban","discrete event simulation","manufacturing systems","production","Industrial Engineering","Psychology"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["https://commons.erau.edu/edt/69"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["<p>In order to become more competitive and aggressive in the marketplace it is imperative for manufacturers to reduce cycle time, limit work-in-process, and improve productivity, responsiveness, capacities, and quality. One manner in which supply chains can be improved is via the use of kanbans in a pull production system. Kanbans refer to a card or signal for productions scheduling within just-in-time (JIT) production systems to signal where and what to produce, when to produce it, and how much. A Kanban based JIT production system has been shown to be beneficial to supply chains for they reduce work-in-process, provide real time status of the system, and enhance communication both up and down stream.</p> <p>While many studies exist in regards to determining optimal number of kanbans, types of kanban systems, and other factors related to kanban system performance, no comprehensive model has been developed to determine kanban size in a manufacturing system with variable workforce production rate and variable demand pattern. This study used Stewart-Marchman-Act, a Daytona Beach rehabilitation center for those with mental disabilities or recovering from addiction that has several manufacturing processes, as a test bed sing mathematical programming and discrete event simulation models to determine 2 the Kanban size empirically. Results from the validated simulation model indicated that there would be a significant reduction in cycle time with a kanban system; on average, there would be a decrease in cycle time of nine days (almost two weeks). Results were discussed and limitations of the study were presented in the end.</p>"]},{"key":"dc:title","label":"Title","values":["Determining Kanban Size Using Mathematical Programming and Discrete Event Simulation for a Manufacturing System with Large Production Variability"]}]}],"canonical_facts":{"dc:creator":["Gaston, Abigail Michele"],"dc:description.abstract":["<p>In order to become more competitive and aggressive in the marketplace it is imperative for manufacturers to reduce cycle time, limit work-in-process, and improve productivity, responsiveness, capacities, and quality. One manner in which supply chains can be improved is via the use of kanbans in a pull production system. Kanbans refer to a card or signal for productions scheduling within just-in-time (JIT) production systems to signal where and what to produce, when to produce it, and how much. A Kanban based JIT production system has been shown to be beneficial to supply chains for they reduce work-in-process, provide real time status of the system, and enhance communication both up and down stream.</p> <p>While many studies exist in regards to determining optimal number of kanbans, types of kanban systems, and other factors related to kanban system performance, no comprehensive model has been developed to determine kanban size in a manufacturing system with variable workforce production rate and variable demand pattern. This study used Stewart-Marchman-Act, a Daytona Beach rehabilitation center for those with mental disabilities or recovering from addiction that has several manufacturing processes, as a test bed sing mathematical programming and discrete event simulation models to determine 2 the Kanban size empirically. Results from the validated simulation model indicated that there would be a significant reduction in cycle time with a kanban system; on average, there would be a decrease in cycle time of nine days (almost two weeks). Results were discussed and limitations of the study were presented in the end.</p>"],"dc:identifier":["https://commons.erau.edu/edt/69"],"dc:subject":["kanban","discrete event simulation","manufacturing systems","production","Industrial Engineering","Psychology"],"dc:title":["Determining Kanban Size Using Mathematical Programming and Discrete Event Simulation for a Manufacturing System with Large Production Variability"],"thesis:degree_discipline":["Human Factors and Systems"],"thesis:degree_level":["Thesis - Open Access"],"thesis:degree_name":["Master of Science in Human Factors & Systems"]},"updated_at":"2026-07-27T19:25:52Z"}