{"id":{"repo_id":"clemson","oai_identifier":"oai:open.clemson.edu:all_theses-2382"},"canonical_url":"https://search.dev.ndltd.org/etd/clemson/oai:open.clemson.edu:all_theses-2382","repository":{"repo_id":"clemson","name":"Clemson University","base_url":"https://open.clemson.edu/do/oai/"},"display":{"title":"Automated Assembly Time Prediction Tool Using Predefined Mates From CAD Assemblies","abstract":"","abstract_html":null,"abstract_has_math":false,"creators":["Owensby, Joseph"],"institution":null,"degree_name":"Master of Science (MS)","degree_level":"Thesis","degree_discipline":null,"degree_department":null,"school":null,"contributors":["Summers, Joshua D","Mocko , Gregory M","Malloy , Brian"],"advisors":[],"committee_chairs":[],"committee_members":[],"year":null,"date_issued":"","date_published":null,"updated_at":"2026-07-27T19:12:39Z","subjects":["Assembly Time Prediction","Automated DFA","Design For Assembly","DFA","Mechanical Engineering"],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[]},"links":{"outbound_url":"https://open.clemson.edu/all_theses/1382","outbound_label":"Repository record","outbound_source":"dc:identifier"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["Summers, Joshua D","Mocko , Gregory M","Malloy , Brian"]},{"key":"dc:creator","label":"Author","values":["Owensby, Joseph"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"thesis:degree_level","label":"Degree Level","values":["Thesis"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science (MS)"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Assembly Time Prediction","Automated DFA","Design For Assembly","DFA","Mechanical Engineering"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["https://open.clemson.edu/all_theses/1382"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:title","label":"Title","values":["Automated Assembly Time Prediction Tool Using Predefined Mates From CAD Assemblies"]}]}],"canonical_facts":{"dc:contributor":["Summers, Joshua D","Mocko , Gregory M","Malloy , Brian"],"dc:creator":["Owensby, Joseph"],"dc:identifier":["https://open.clemson.edu/all_theses/1382"],"dc:subject":["Assembly Time Prediction","Automated DFA","Design For Assembly","DFA","Mechanical Engineering"],"dc:title":["Automated Assembly Time Prediction Tool Using Predefined Mates From CAD Assemblies"],"thesis:degree_level":["Thesis"],"thesis:degree_name":["Master of Science (MS)"]},"updated_at":"2026-07-27T19:12:39Z"}