Abstract
dc:description.abstractThe objective of this investigation was to develop a control strategy for the operation of an equalization tank upstream of a waste water treatment plant which utilizes the available equalization hold-up volume in such a manner that it reduces, optimally, diurnal fluctuations in both influent flow and load rates. The influent to a wastewater treatment plant generally exhibits wide diurnal variations in both flow rate and concentration, and consequently in load rate (defined as the product of flow rate and concentration). Deviations of these parameters from steady state cause plant operating problems in areas such as aeration control (due to load rate fluctuations) settling tank overloading due to flow rate fluctuations) and/or over- or under-aeration which affects settling properties, and others.
Degree
thesis:*- Grantor dc:publisher.institution
- Department of Civil Engineering
- Year dc:date.issued
- 1982
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Dold, Peter Lorimer
- Advisor dc:contributor.advisor
-
- Marais, Gerrit van Rooyen
Rights
- Language dc:language.iso
- eng
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- http://hdl.handle.net/11427/9922
- OAI identifier oai:identifier
- oai:open.uct.ac.za:11427/9922