{"id":{"repo_id":"cape-town","oai_identifier":"oai:open.uct.ac.za:11427/9776"},"canonical_url":"https://search.dev.ndltd.org/etd/cape-town/oai:open.uct.ac.za:11427/9776","repository":{"repo_id":"cape-town","name":"University of Cape Town","base_url":"https://open.uct.ac.za/oai/request"},"display":{"title":"Significant constraints hindering implementation of the EIA regulations by relevant environmental authorities in South Africa","abstract":"This research is focused on determining the most significant constraints hindering the implementation of the EIA regulations in South Africa by the Relevant Environmental Authorities (REAs). The impetus for this research was provided by a literature search, information obtained at an International Association for Impact Assessment (IAIA) workshop held in 1999 and personal discussions with the main participants in the EIA process. This study adopts a broad approach to obtain the perceptions of the main participants in the EIA process (Regulatory Authorities, Consultants and Interested and Affected Parties), in order to identify the most significant constraints hindering EIA implementation in South Africa. The research was conducted in six of the nine provinces. Although many criteria were considered, the three main criteria used for selecting the six provinces include the research budget, geographical location and the economic characteristics of each province.","abstract_html":"This research is focused on determining the most significant constraints hindering the implementation of the EIA regulations in South Africa by the Relevant Environmental Authorities (REAs). The impetus for this research was provided by a literature search, information obtained at an International Association for Impact Assessment (IAIA) workshop held in 1999 and personal discussions with the main participants in the EIA process. This study adopts a broad approach to obtain the perceptions of the main participants in the EIA process (Regulatory Authorities, Consultants and Interested and Affected Parties), in order to identify the most significant constraints hindering EIA implementation in South Africa. The research was conducted in six of the nine provinces. Although many criteria were considered, the three main criteria used for selecting the six provinces include the research budget, geographical location and the economic characteristics of each province.","abstract_has_math":false,"creators":["Stevens, Duncan John Deuchar"],"institution":"Department of Environmental and Geographical Science","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":["Hill, Richard"],"committee_chairs":[],"committee_members":[],"year":2002,"date_issued":"2002","date_published":"2002","updated_at":"2026-07-22T22:22:43Z","subjects":[],"languages":["heb"],"rights":[],"rights_urls":[],"identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/11427/9776","outbound_label":"Handle","outbound_source":"dc:identifier.uri"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Hill, Richard"]},{"key":"dc:creator","label":"Author","values":["Stevens, Duncan John Deuchar"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2014-11-22T05:48:13Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2014-11-22T05:48:13Z"]},{"key":"dc:date.issued","label":"Date","values":["2002"]},{"key":"dc:publisher.department","label":"Dc Publisher Department","values":["Department of Environmental and Geographical Science"]},{"key":"dc:publisher.institution","label":"Dc Publisher Institution","values":["University of Cape Town"]},{"key":"dc:type","label":"Dc Type","values":["Master Thesis"]},{"key":"dc:type.qualificationlevel","label":"Dc Type Qualificationlevel","values":["Masters"]},{"key":"dc:type.qualificationname","label":"Dc Type Qualificationname","values":["MSc"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["heb"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/11427/9776"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["Bibliography: leaves 117-125."]},{"key":"dc:description.abstract","label":"Abstract","values":["This research is focused on determining the most significant constraints hindering the implementation of the EIA regulations in South Africa by the Relevant Environmental Authorities (REAs). The impetus for this research was provided by a literature search, information obtained at an International Association for Impact Assessment (IAIA) workshop held in 1999 and personal discussions with the main participants in the EIA process. This study adopts a broad approach to obtain the perceptions of the main participants in the EIA process (Regulatory Authorities, Consultants and Interested and Affected Parties), in order to identify the most significant constraints hindering EIA implementation in South Africa. The research was conducted in six of the nine provinces. Although many criteria were considered, the three main criteria used for selecting the six provinces include the research budget, geographical location and the economic characteristics of each province."]},{"key":"dc:title","label":"Title","values":["Significant constraints hindering implementation of the EIA regulations by relevant environmental authorities in South Africa"]}]}],"canonical_facts":{"dc:contributor.advisor":["Hill, Richard"],"dc:creator":["Stevens, Duncan John Deuchar"],"dc:date.accessioned":["2014-11-22T05:48:13Z"],"dc:date.available":["2014-11-22T05:48:13Z"],"dc:date.issued":["2002"],"dc:description":["Bibliography: leaves 117-125."],"dc:description.abstract":["This research is focused on determining the most significant constraints hindering the implementation of the EIA regulations in South Africa by the Relevant Environmental Authorities (REAs). The impetus for this research was provided by a literature search, information obtained at an International Association for Impact Assessment (IAIA) workshop held in 1999 and personal discussions with the main participants in the EIA process. This study adopts a broad approach to obtain the perceptions of the main participants in the EIA process (Regulatory Authorities, Consultants and Interested and Affected Parties), in order to identify the most significant constraints hindering EIA implementation in South Africa. The research was conducted in six of the nine provinces. Although many criteria were considered, the three main criteria used for selecting the six provinces include the research budget, geographical location and the economic characteristics of each province."],"dc:identifier.uri":["http://hdl.handle.net/11427/9776"],"dc:language.iso":["heb"],"dc:publisher.department":["Department of Environmental and Geographical Science"],"dc:publisher.institution":["University of Cape Town"],"dc:title":["Significant constraints hindering implementation of the EIA regulations by relevant environmental authorities in South Africa"],"dc:type":["Master Thesis"],"dc:type.qualificationlevel":["Masters"],"dc:type.qualificationname":["MSc"]},"updated_at":"2026-07-22T22:22:43Z"}