Back to results

Department of Electrical Engineering

A feasibility study for an IMC application in the mining industry

Abstract

dc:description.abstract

This project is a feasibility study using Internal Model Control strategies to optimise the performance of a secondary and tertiary crusher stage at a mine. First, a mathematical model of the plant is_ extracted and simulated. The viability of using IMC on an unstable process is considered. Various general objectives are then explained, whereafter the manually controlled plant is evaluated. Three strategies are proposed that control the bin levels to optimise buffer capacity so that crusher throughput is increased and efficiency improved. These are tested on a simulator fed with real plant data to reveal their properties. Finally, an implementation scheme is then proposed.

Degree

thesis:*
Grantor dc:publisher.institution
Department of Electrical Engineering
Year dc:date.issued
1994

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Hacker, R J
Advisor dc:contributor.advisor
  • Braae, Martin

Rights

Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/11427/8463
OAI identifier oai:identifier
oai:open.uct.ac.za:11427/8463

Chain of custody

source
Harvested from
University of Cape Town
Base URL
open.uct.ac.za/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
related terms
citation

Hacker, R J. A feasibility study for an IMC application in the mining industry. Department of Electrical Engineering, 1994. http://hdl.handle.net/11427/8463