Department of Civil Engineering
Biological excess phosphorus removal in activated sludge systems
Abstract
dc:description.abstractWhen this investigation was commenced in 1983 two activated sludge systems had been developed in South Africa that accomplish biological excess phosphorus (P) removal, the UCT and modified Bardenpho systems. To predict the P removal in these systems, an empirical model had been developed. In the empirical model, P removal was formulated in terms of some of the system parameters, such as anaerobic mass fraction, available readily biodegradable COD and active mass concentration. Organisms directly implicated in biological excess P removal (poly P organisms) did not feature in the model and the P removal was not linked to any basic biological or biochemical behaviour. Clearly, there was a need for a more fundamentally based model. The objective of this thesis was to develop such a model.
Degree
thesis:*- Grantor dc:publisher.institution
- Department of Civil Engineering
- Year dc:date.issued
- 1988
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Wentzel, Mark Charles
- Advisor dc:contributor.advisor
-
- Marais, Gerrit van Rooyen
Rights
- Language dc:language.iso
- eng
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- http://hdl.handle.net/11427/8309
- OAI identifier oai:identifier
- oai:open.uct.ac.za:11427/8309