Back to results

Department of Civil Engineering

Biological excess phosphorus removal in activated sludge systems

Abstract

dc:description.abstract

When this investigation was commenced in 1983 two activated sludge systems had been developed in South Africa that accomplish biological excess phosphorus (P) removal, the UCT and modified Bardenpho systems. To predict the P removal in these systems, an empirical model had been developed. In the empirical model, P removal was formulated in terms of some of the system parameters, such as anaerobic mass fraction, available readily biodegradable COD and active mass concentration. Organisms directly implicated in biological excess P removal (poly P organisms) did not feature in the model and the P removal was not linked to any basic biological or biochemical behaviour. Clearly, there was a need for a more fundamentally based model. The objective of this thesis was to develop such a model.

Degree

thesis:*
Grantor dc:publisher.institution
Department of Civil Engineering
Year dc:date.issued
1988

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Wentzel, Mark Charles
Advisor dc:contributor.advisor
  • Marais, Gerrit van Rooyen

Rights

Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/11427/8309
OAI identifier oai:identifier
oai:open.uct.ac.za:11427/8309

Chain of custody

source
Harvested from
University of Cape Town
Base URL
open.uct.ac.za/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
related terms
citation

Wentzel, Mark Charles. Biological excess phosphorus removal in activated sludge systems. Department of Civil Engineering, 1988. http://hdl.handle.net/11427/8309