Back to results

Department of Electrical Engineering

Study and implementation of load monitoring on an 11 kV underground cable distribution network

Abstract

dc:description.abstract

Operating and Planning staff of an electricitY supply utility have expressed the opinion that a load monitoring system needed to be installed at protected substations forming part of an 11 kV underground cable reticulation network. Load information was currently only available from feeders connected to the 132/11 kV stepdown substations which provide infeeds to the system. The staff felt that the availability of feeder load information from the protected substation level of the 11 kV ring network would assist in more efficient system planning and more accurate system operation. This request for additional load data constituted the main motivation for the project described in this report. The two main objectives of the project can thus be stated as follows: (i) To prove conclusively that there were benefits to be derived from implementing load monitoring at protected susbstations on the 11 kV reticulation network. (ii) To implement a suitable load monitoring system if the study resulting from (i) proved this was necessary.

Degree

thesis:*
Grantor dc:publisher.institution
Department of Electrical Engineering
Year dc:date.issued
1987

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Hampton, Brent Gary
Advisor dc:contributor.advisor
  • Reineck, K M

Rights

Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/11427/21865
OAI identifier oai:identifier
oai:open.uct.ac.za:11427/21865

Chain of custody

source
Harvested from
University of Cape Town
Base URL
open.uct.ac.za/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
related terms
citation

Hampton, Brent Gary. Study and implementation of load monitoring on an 11 kV underground cable distribution network. Department of Electrical Engineering, 1987. http://hdl.handle.net/11427/21865