{"id":{"repo_id":"cape-town","oai_identifier":"oai:open.uct.ac.za:11427/18877"},"canonical_url":"https://search.dev.ndltd.org/etd/cape-town/oai:open.uct.ac.za:11427/18877","repository":{"repo_id":"cape-town","name":"University of Cape Town","base_url":"https://open.uct.ac.za/oai/request"},"display":{"title":"LHDA 1000 impact assessment : impact assessment report","abstract":"The purpose of this report is to present an impact assessment of two possible access routes to the Mohale Dam in Lesotho, namely the Western Access Road and the Least Cost Alternative Route. It is an academic work to demonstrate an adequate grasp of principles, methods and techniques appropriate to the assessment, termed LHDA 1000. The water resources of Lesotho are being exploited to augment the current supply to the PWV industrial area of the Republic of South Africa, in terms of the Lesotho Highlands Water Project. This project is being implemented in phases. Phase lA, currently being constructed, involves the damming of the Malibamatso River at Katse in the Maluti Mountains (Figure1), a transfer tunnel through the mountains, a hydroelectric power station at 'Muela in Lesotho, and a delivery tunnel under the Caledon River to the Ash River (a tributary of the Vaal River which feeds the primary PW impoundment, the Vaal Dam) in the South Africa.","abstract_html":"The purpose of this report is to present an impact assessment of two possible access routes to the Mohale Dam in Lesotho, namely the Western Access Road and the Least Cost Alternative Route. It is an academic work to demonstrate an adequate grasp of principles, methods and techniques appropriate to the assessment, termed LHDA 1000. The water resources of Lesotho are being exploited to augment the current supply to the PWV industrial area of the Republic of South Africa, in terms of the Lesotho Highlands Water Project. This project is being implemented in phases. Phase lA, currently being constructed, involves the damming of the Malibamatso River at Katse in the Maluti Mountains (Figure1), a transfer tunnel through the mountains, a hydroelectric power station at &#x27;Muela in Lesotho, and a delivery tunnel under the Caledon River to the Ash River (a tributary of the Vaal River which feeds the primary PW impoundment, the Vaal Dam) in the South Africa.","abstract_has_math":false,"creators":["Avis, Jeremy Estrup"],"institution":"Department of Environmental and Geographical Science","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":["Fuggle, Richard Francis"],"committee_chairs":[],"committee_members":[],"year":1993,"date_issued":"1993","date_published":"1993","updated_at":"2026-07-22T22:22:38Z","subjects":[],"languages":["eng"],"rights":[],"rights_urls":[],"identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/11427/18877","outbound_label":"Handle","outbound_source":"dc:identifier.uri"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Fuggle, Richard Francis"]},{"key":"dc:creator","label":"Author","values":["Avis, Jeremy Estrup"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2016-04-13T14:29:53Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2016-04-13T14:29:53Z"]},{"key":"dc:date.issued","label":"Date","values":["1993"]},{"key":"dc:publisher.department","label":"Dc Publisher Department","values":["Department of Environmental and Geographical Science"]},{"key":"dc:publisher.institution","label":"Dc Publisher Institution","values":["University of Cape Town"]},{"key":"dc:type","label":"Dc Type","values":["Master Thesis"]},{"key":"dc:type.qualificationlevel","label":"Dc Type Qualificationlevel","values":["Masters"]},{"key":"dc:type.qualificationname","label":"Dc Type Qualificationname","values":["MPhil"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["eng"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/11427/18877"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["Summary in English."]},{"key":"dc:description.abstract","label":"Abstract","values":["The purpose of this report is to present an impact assessment of two possible access routes to the Mohale Dam in Lesotho, namely the Western Access Road and the Least Cost Alternative Route. It is an academic work to demonstrate an adequate grasp of principles, methods and techniques appropriate to the assessment, termed LHDA 1000. The water resources of Lesotho are being exploited to augment the current supply to the PWV industrial area of the Republic of South Africa, in terms of the Lesotho Highlands Water Project. This project is being implemented in phases. Phase lA, currently being constructed, involves the damming of the Malibamatso River at Katse in the Maluti Mountains (Figure1), a transfer tunnel through the mountains, a hydroelectric power station at 'Muela in Lesotho, and a delivery tunnel under the Caledon River to the Ash River (a tributary of the Vaal River which feeds the primary PW impoundment, the Vaal Dam) in the South Africa."]},{"key":"dc:title","label":"Title","values":["LHDA 1000 impact assessment : impact assessment report"]}]}],"canonical_facts":{"dc:contributor.advisor":["Fuggle, Richard Francis"],"dc:creator":["Avis, Jeremy Estrup"],"dc:date.accessioned":["2016-04-13T14:29:53Z"],"dc:date.available":["2016-04-13T14:29:53Z"],"dc:date.issued":["1993"],"dc:description":["Summary in English."],"dc:description.abstract":["The purpose of this report is to present an impact assessment of two possible access routes to the Mohale Dam in Lesotho, namely the Western Access Road and the Least Cost Alternative Route. It is an academic work to demonstrate an adequate grasp of principles, methods and techniques appropriate to the assessment, termed LHDA 1000. The water resources of Lesotho are being exploited to augment the current supply to the PWV industrial area of the Republic of South Africa, in terms of the Lesotho Highlands Water Project. This project is being implemented in phases. Phase lA, currently being constructed, involves the damming of the Malibamatso River at Katse in the Maluti Mountains (Figure1), a transfer tunnel through the mountains, a hydroelectric power station at 'Muela in Lesotho, and a delivery tunnel under the Caledon River to the Ash River (a tributary of the Vaal River which feeds the primary PW impoundment, the Vaal Dam) in the South Africa."],"dc:identifier.uri":["http://hdl.handle.net/11427/18877"],"dc:language.iso":["eng"],"dc:publisher.department":["Department of Environmental and Geographical Science"],"dc:publisher.institution":["University of Cape Town"],"dc:title":["LHDA 1000 impact assessment : impact assessment report"],"dc:type":["Master Thesis"],"dc:type.qualificationlevel":["Masters"],"dc:type.qualificationname":["MPhil"]},"updated_at":"2026-07-22T22:22:38Z"}