Back to results

Department of Mechanical Engineering

Productivity in construction contracting

Abstract

dc:description.abstract

Increases in productivity in construction contractin0 since 1960 have not been proportional to the large amounts of money spent on mechanization and on the training of labour. Little consideration has been given during this same period to behavioural techniques and the motivation of manpower and it was therefore felt that the adoption of a behavioural approach would result in a significant increase in productivity in the industry. Since any behavioural theoretical generalization requires empiric information about any particular situation, it was necessary to collect data on certain socio-organizational characteristics of construction contracting. Data was collected mainly by means of two attitude questionnaires distributed amongst middle to lower management personnel employed in main contractor and sub-contractor companies in the Western Cape. The analysis of the data centred on the socio-organizational characteristics of contracting, their effect on motivation to obtain increased productivity on both the macro and micro levels, and the relationships between main contractor and sub-contractors. It was apparent that ample scope still existed for the development of behavioural management techniques in construction contracting.

Degree

thesis:*
Grantor dc:publisher.institution
Department of Mechanical Engineering
Year dc:date.issued
1977

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Eleuteri, Franco Maria Romano
Advisor dc:contributor.advisor
  • Dutkiewicz, Ryszard Karol

Rights

Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/11427/18079
OAI identifier oai:identifier
oai:open.uct.ac.za:11427/18079

Chain of custody

source
Harvested from
University of Cape Town
Base URL
open.uct.ac.za/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
related terms
citation

Eleuteri, Franco Maria Romano. Productivity in construction contracting. Department of Mechanical Engineering, 1977. http://hdl.handle.net/11427/18079