Back to results

Energy Research Centre

A computable general equilibrium analysis of the proposed build plans as presented in the integrated resource plan

Abstract

dc:description.abstract

Global concerns with regard to electricity supply ranged from growing demand (especially in developing countries), energy security, diversity of supply, safety and the global movement towards low-carbon technologies. The Integrated Resource Plan (IRP) is an operational process by which these concerns as well as other policy goals are addressed. This is done with the aim of providing a long-term plan for the electricity sector. The current modelling approach used in the IRP is unable to quantify the effects on various policy goals that the plan is likely to have. This thesis uses a CGE model to analyse the plan in terms of some of these policy goals in an attempt to fill this analytical gap. The base case, revised balanced and policy-adjusted scenarios are simulated in the E-SAGE model developed by Arndt et al. (2008).

Degree

thesis:*
Grantor dc:publisher.institution
Energy Research Centre
Year dc:date.issued
2011

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Caetano, Tara Helena
Advisor dc:contributor.advisor
  • Marquard, Andrew

Rights

Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/11427/10176
OAI identifier oai:identifier
oai:open.uct.ac.za:11427/10176

Chain of custody

source
Harvested from
University of Cape Town
Base URL
open.uct.ac.za/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
related terms
citation

Caetano, Tara Helena. A computable general equilibrium analysis of the proposed build plans as presented in the integrated resource plan. Energy Research Centre, 2011. http://hdl.handle.net/11427/10176