Back to results

University of Cambridge

Automated Spatial Progress Monitoring for Asphalt Road Construction Projects

Abstract

dc:description.abstract

Construction progress monitoring allows schedule and/or cost deviations to be identified early enough to effectively implement corrective actions. At least 77% of transportation projects experience cost overruns, and as much as 75% of these overruns have been attributed to “real” construction management factors like progress monitoring. Progress is measured on road construction sites in terms of completion percentages at various activity and work package levels. This percentage is then used to identify schedule deviations and support the earned value analysis often used as the baseline for contractor progress payments. Unfortunately, the current methods for producing these completion percentages are not as correct or time efficient as they should be to enable effective project control. The objective of this research is to develop, test, and validate a novel solution for automatically producing completion percentages and progress status determinations that are more correct and time efficient than those generated in current practice. The proposed solution seeks to automatically detect incremental progress on road design layers in 3D as-built point cloud data generated using unmanned aerial photogrammetry and a novel data simulation approach. A parallel as-planned progress estimate is also automatically prepared using 4D information, and the progress status determinations are made by comparing the two results. This solution was tested on 15 datasets (13 simulated and 2 real-world) representing a variety of road designs and progress conditions. The method achieved an average 95% F1 score in layer detection on the real-world data, and mostly outperformed current practice in correctness. The automated processing of as-built and as-planned data to produce the progress estimate took 12 seconds for the real world data, which was indeed faster than the current practice equivalent. Although the research objectives were met, there remains room for further improvement, particularly in regards to the solution’s robustness to occlusions on the monitored surfaces.

Degree

thesis:*
Name dc:type.qualificationname
Doctor of Philosophy (PhD)
Level dc:type.qualificationlevel
Doctoral
Grantor dc:publisher.institution
University of Cambridge
Year dc:date.issued
2018

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Vick, Steven
Advisor dc:contributor.advisor
  • Brilakis, Ioannis

Subjects

dc:subject × 4

Rights

dc:rights
Language dc:language
en

Identifiers

dc:identifier.*
OAI identifier oai:identifier
oai:www.repository.cam.ac.uk:1810/278795

Chain of custody

source
Harvested from
Cambridge University
Base URL
api.repository.cam.ac.uk/server/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Vick, Steven. Automated Spatial Progress Monitoring for Asphalt Road Construction Projects. Doctoral thesis, University of Cambridge, 2018. https://doi.org/10.17863/CAM.26162