{"id":{"repo_id":"calpoly","oai_identifier":"oai:digitalcommons.calpoly.edu:theses-1831"},"canonical_url":"https://search.dev.ndltd.org/etd/calpoly/oai:digitalcommons.calpoly.edu:theses-1831","repository":{"repo_id":"calpoly","name":"Cal Poly","base_url":"https://digitalcommons.calpoly.edu/do/oai/"},"display":{"title":"Like Laws and Sausages: The Tale of a Mere Portion of the Process to Develop the South Broad Street Corridor Plan","abstract":"<p>The processes to develop community plans share certain standard activities and stages while remaining distinctive and without pre-scripted procedures. This study documents the process that yielded the South Broad Street Corridor Plan June 2012 draft. The objective is to present the decision-making processes and their connections to the final plan document along with the plan document itself.</p>","abstract_html":"&lt;p&gt;The processes to develop community plans share certain standard activities and stages while remaining distinctive and without pre-scripted procedures. This study documents the process that yielded the South Broad Street Corridor Plan June 2012 draft. The objective is to present the decision-making processes and their connections to the final plan document along with the plan document itself.&lt;/p&gt;","abstract_has_math":false,"creators":["Lopez, Amy R"],"institution":null,"degree_name":"Master of City and Regional Planning/MS in Engineering (Transportation Planning Specialization)","degree_level":null,"degree_discipline":"City and Regional Planning","degree_department":null,"school":null,"contributors":["Umut Toker"],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2012,"date_issued":"2012-06-01T07:00:00Z","date_published":"2012-06-01T07:00:00Z","updated_at":"2026-07-24T01:32:37Z","subjects":["area plan","community plan","public planning process","San Luis Obispo","South Broad Street Corridor Plan","Environmental Design","Policy Design, Analysis, and Evaluation","Urban, Community and Regional Planning"],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier","label":"Identifier","values":["10.15368/theses.2012.106"],"render_values":[{"text":"10.15368/theses.2012.106","href":"https://doi.org/10.15368/theses.2012.106","code":true}]}]},"links":{"outbound_url":"https://digitalcommons.calpoly.edu/theses/789","outbound_label":"Repository record","outbound_source":"dc:identifier"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["Umut Toker"]},{"key":"dc:creator","label":"Author","values":["Lopez, Amy R"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.available","label":"Dc Date Available","values":["2012-06-13T07:00:00Z"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["City and Regional Planning"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of City and Regional Planning/MS in Engineering (Transportation Planning Specialization)"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["area plan","community plan","public planning process","San Luis Obispo","South Broad Street Corridor Plan","Environmental Design","Policy Design, Analysis, and Evaluation","Urban, Community and Regional Planning"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["https://digitalcommons.calpoly.edu/theses/789","10.15368/theses.2012.106"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["<p>The processes to develop community plans share certain standard activities and stages while remaining distinctive and without pre-scripted procedures. This study documents the process that yielded the South Broad Street Corridor Plan June 2012 draft. The objective is to present the decision-making processes and their connections to the final plan document along with the plan document itself.</p>"]},{"key":"dc:title","label":"Title","values":["Like Laws and Sausages: The Tale of a Mere Portion of the Process to Develop the South Broad Street Corridor Plan"]}]}],"canonical_facts":{"dc:contributor":["Umut Toker"],"dc:creator":["Lopez, Amy R"],"dc:date.available":["2012-06-13T07:00:00Z"],"dc:description.abstract":["<p>The processes to develop community plans share certain standard activities and stages while remaining distinctive and without pre-scripted procedures. This study documents the process that yielded the South Broad Street Corridor Plan June 2012 draft. The objective is to present the decision-making processes and their connections to the final plan document along with the plan document itself.</p>"],"dc:identifier":["https://digitalcommons.calpoly.edu/theses/789","10.15368/theses.2012.106"],"dc:subject":["area plan","community plan","public planning process","San Luis Obispo","South Broad Street Corridor Plan","Environmental Design","Policy Design, Analysis, and Evaluation","Urban, Community and Regional Planning"],"dc:title":["Like Laws and Sausages: The Tale of a Mere Portion of the Process to Develop the South Broad Street Corridor Plan"],"thesis:degree_discipline":["City and Regional Planning"],"thesis:degree_name":["Master of City and Regional Planning/MS in Engineering (Transportation Planning Specialization)"]},"updated_at":"2026-07-24T01:32:37Z"}