{"id":{"repo_id":"calgary","oai_identifier":"oai:ucalgary.scholaris.ca:11023/3523"},"canonical_url":"https://search.dev.ndltd.org/etd/calgary/oai:ucalgary.scholaris.ca:11023/3523","repository":{"repo_id":"calgary","name":"University of Calgary","base_url":"https://ucalgary.scholaris.ca/server/oai/request"},"display":{"title":"Tool For Calculating User Delay Cost Associated With Urban Arterial Construction Zone","abstract":"Roadway construction work zone imposes travel delay on the road users. The monetary cost of the delay is called user delay cost (UDC). Limited work has been done on quantifying UDC in Canada and their focus were rural highways. If there is a realistic estimate of UDC, it could lead to less schedule overruns and more cost-effective work zone layouts. Considering interest of roadway agencies in quantifying UDC associated with urban arterial work zones, this research developed a probabilistic tool for monetizing UDC in urban setting using traffic microscopic simulation and Monte-Carlo simulation. Based on this tool, one hour of morning peak construction work on NB Crowchild Bridge created 169.2 hr of vehicles delay with average and 95 percentile UDC equal to $2,199 and $5,653, respectively. The application of the tool for selecting optimum work zone layout was demonstrated using the data from the rehabilitation of Bow Bridge in Calgary.","abstract_html":"Roadway construction work zone imposes travel delay on the road users. The monetary cost of the delay is called user delay cost (UDC). Limited work has been done on quantifying UDC in Canada and their focus were rural highways. If there is a realistic estimate of UDC, it could lead to less schedule overruns and more cost-effective work zone layouts. Considering interest of roadway agencies in quantifying UDC associated with urban arterial work zones, this research developed a probabilistic tool for monetizing UDC in urban setting using traffic microscopic simulation and Monte-Carlo simulation. Based on this tool, one hour of morning peak construction work on NB Crowchild Bridge created 169.2 hr of vehicles delay with average and 95 percentile UDC equal to $2,199 and $5,653, respectively. The application of the tool for selecting optimum work zone layout was demonstrated using the data from the rehabilitation of Bow Bridge in Calgary.","abstract_has_math":true,"creators":["Ghaffari Dolama, Maryam"],"institution":"Graduate Studies","degree_name":"Master of Science (MSc)","degree_level":null,"degree_discipline":"Civil Engineering","degree_department":null,"school":null,"contributors":[],"advisors":["Cowe Falls, Lynne"],"committee_chairs":[],"committee_members":["Jergeas, George","Kattan, Lina","Behjat, Laleh"],"year":2016,"date_issued":"2016","date_published":"2016","updated_at":"2026-07-24T01:30:20Z","subjects":["Economics--Finance","Sociology--Transportation","Urban and Regional Planning","Engineering--Civil"],"languages":["eng"],"rights":["University of Calgary graduate students retain copyright ownership and moral rights for their thesis. You may use this material in any way that is permitted by the Copyright Act or through licensing that has been assigned to the document. For uses that are not allowable under copyright legislation or licensing, you are required to seek permission."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.doi","label":"DOI","values":["http://dx.doi.org/10.11575/PRISM/28464"],"render_values":[{"text":"http://dx.doi.org/10.11575/PRISM/28464","href":"http://dx.doi.org/10.11575/PRISM/28464","code":true}]}]},"links":{"outbound_url":"http://hdl.handle.net/11023/3523","outbound_label":"Handle","outbound_source":"dc:identifier.uri"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Cowe Falls, Lynne"]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Jergeas, George","Kattan, Lina","Behjat, Laleh"]},{"key":"dc:creator","label":"Author","values":["Ghaffari Dolama, Maryam"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2017-01-02T20:23:06Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2017-01-02T20:23:06Z"]},{"key":"dc:date.issued","label":"Date","values":["2016"]},{"key":"dc:publisher.institution","label":"Dc Publisher Institution","values":["University of Calgary"]},{"key":"dc:type","label":"Dc Type","values":["master thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Civil Engineering"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science (MSc)"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Calgary"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Economics--Finance","Sociology--Transportation","Urban and Regional Planning","Engineering--Civil"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["eng"]},{"key":"dc:rights","label":"Dc Rights","values":["University of Calgary graduate students retain copyright ownership and moral rights for their thesis. You may use this material in any way that is permitted by the Copyright Act or through licensing that has been assigned to the document. For uses that are not allowable under copyright legislation or licensing, you are required to seek permission."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.doi","label":"DOI","values":["http://dx.doi.org/10.11575/PRISM/28464"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/11023/3523"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Roadway construction work zone imposes travel delay on the road users. The monetary cost of the delay is called user delay cost (UDC). Limited work has been done on quantifying UDC in Canada and their focus were rural highways. If there is a realistic estimate of UDC, it could lead to less schedule overruns and more cost-effective work zone layouts. Considering interest of roadway agencies in quantifying UDC associated with urban arterial work zones, this research developed a probabilistic tool for monetizing UDC in urban setting using traffic microscopic simulation and Monte-Carlo simulation. Based on this tool, one hour of morning peak construction work on NB Crowchild Bridge created 169.2 hr of vehicles delay with average and 95 percentile UDC equal to $2,199 and $5,653, respectively. The application of the tool for selecting optimum work zone layout was demonstrated using the data from the rehabilitation of Bow Bridge in Calgary."]},{"key":"dc:title","label":"Title","values":["Tool For Calculating User Delay Cost Associated With Urban Arterial Construction Zone"]}]}],"canonical_facts":{"dc:contributor.advisor":["Cowe Falls, Lynne"],"dc:contributor.committeemember":["Jergeas, George","Kattan, Lina","Behjat, Laleh"],"dc:creator":["Ghaffari Dolama, Maryam"],"dc:date.accessioned":["2017-01-02T20:23:06Z"],"dc:date.available":["2017-01-02T20:23:06Z"],"dc:date.issued":["2016"],"dc:description.abstract":["Roadway construction work zone imposes travel delay on the road users. The monetary cost of the delay is called user delay cost (UDC). Limited work has been done on quantifying UDC in Canada and their focus were rural highways. If there is a realistic estimate of UDC, it could lead to less schedule overruns and more cost-effective work zone layouts. Considering interest of roadway agencies in quantifying UDC associated with urban arterial work zones, this research developed a probabilistic tool for monetizing UDC in urban setting using traffic microscopic simulation and Monte-Carlo simulation. Based on this tool, one hour of morning peak construction work on NB Crowchild Bridge created 169.2 hr of vehicles delay with average and 95 percentile UDC equal to $2,199 and $5,653, respectively. The application of the tool for selecting optimum work zone layout was demonstrated using the data from the rehabilitation of Bow Bridge in Calgary."],"dc:identifier.doi":["http://dx.doi.org/10.11575/PRISM/28464"],"dc:identifier.uri":["http://hdl.handle.net/11023/3523"],"dc:language.iso":["eng"],"dc:publisher.institution":["University of Calgary"],"dc:rights":["University of Calgary graduate students retain copyright ownership and moral rights for their thesis. You may use this material in any way that is permitted by the Copyright Act or through licensing that has been assigned to the document. For uses that are not allowable under copyright legislation or licensing, you are required to seek permission."],"dc:subject":["Economics--Finance","Sociology--Transportation","Urban and Regional Planning","Engineering--Civil"],"dc:title":["Tool For Calculating User Delay Cost Associated With Urban Arterial Construction Zone"],"dc:type":["master thesis"],"thesis:degree_discipline":["Civil Engineering"],"thesis:degree_name":["Master of Science (MSc)"],"thesis:institution_name":["University of Calgary"]},"updated_at":"2026-07-24T01:30:20Z"}