Brigham Young University - Provo
Development of a User Cost Estimation Procedure for Work Zones.
Abstract
dc:description.abstractWork zones associated with highway construction projects create localized bottlenecks where the average traffic speed is reduced and queues are formed, thus causing increased costs as a result of the additional time and fuel needed to traverse the work zone. These user costs can be estimated and applied as a form of incentive to the contractor to complete the work sooner, thus allowing traffic to return to the free-flow speed. Methods to determine user costs are explored through a literature search, questionnaire survey, and interviews with employees of the Utah Department of Transportation (UDOT). Based on the research and interviews, a program named DUCK was developed to estimate the costs attributed to the reduction of speed through a work zone. A plan using DUCK and another program, DelayE, is recommended to UDOT, along with a description of these computer programs and how they estimate user costs.
Degree
thesis:*- Name thesis:degree_name
- MS
- Grantor dc:publisher
- Brigham Young University - Provo
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Adams, Michael Roy
Subjects
dc:subject × 4Rights
- Language dc:language
- English
Identifiers
dc:identifier.*- Repository record dc:identifier
- https://scholarsarchive.byu.edu/etd/572
- OAI identifier oai:identifier
- oai:scholarsarchive.byu.edu:etd-1571