Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 20 of 30 for “"time schedule"”.

  1. Time / schedule control of engineering projects in the South Western Cape

    … contradictory and confusing advice on project time/schedule control requirements. This research integrates and extends present time/schedule control theory. It includes a review of the literature, in which the fragmented theory is pieced together in a model describing the operation of a control …

    cape-town Repository record for Time / schedule control of engineering projects in the South Western Cape (opens in a new tab)

  2. Short-term memory, associative learning and reading achievement of two groups of college freshmen

    … of seventh grade students participating in block time scheduling compared to the achievement scores of students enrolled in traditional scheduling in two junior high schools of the Fort Wayne Community School Corporation.Seventh grade students in two junior high schools in the Fort Wayne Community …

    ballstate-thes Repository record for Short-term memory, associative learning and reading achievement of two groups of college freshmen (opens in a new tab)

  3. Persistence of response variation and repetition

    A multiple chained schedule was used to assess the persistence of fixed and variable response sequences. In one terminal link, a single 4-peck response sequence produced food (Repeat) and in the other terminal link a 4-peck response sequence produced food only if it had been occurring infrequently …

    wvu Repository record for Persistence of response variation and repetition (opens in a new tab)

  4. Identifying Common Ultrasonic Predictive Failure Signatures in Bearing Elements for the Development of an Automated Condition Based Ultrasonic Monitoring Controller.

    … of lubrication when needed, as opposed to a time schedule based on average performance or history. The work from this thesis will be used to help reduce equipment downtime and maintenance cost when utilized in an industrial environment.</p>

    etsu Repository record for Identifying Common Ultrasonic Predictive Failure Signatures in Bearing Elements for the Development of an Automated Condition Based Ultrasonic Monitoring Controller. (opens in a new tab)

  5. Design Implementation Of A Microcontroller Based External Facility Access Control System

    … system that provides exterior doors with a time schedule and allows authorized users to gain access to the facility after hours was developed. A microcontroller based system has been designed to interface with a personal computer. The system designed within this thesis can be used as a …

    ucf

  6. The Effects of the Classroom Schedule and Teacher Beliefs on Head Start Teacher-Child Interactions

    Time can be examined from several viewpoints in the early childhood classroom: wasted wait time; instruction which is undifferentiated or not on the child’s cognitivelevel, missing the child’s target learning needs; the source and control of the classroomschedule; children’s perceptions of time; …

    umkc Repository record for The Effects of the Classroom Schedule and Teacher Beliefs on Head Start Teacher-Child Interactions (opens in a new tab)

  7. A comparative analysis of physical activity interventions for young children

    … of physical activity and according to a fixed-time schedule was compared in an intervention analysis. The overall results of the study indicated that children were most active when receiving a form of social reinforcement contingent on higher levels of physical activity. These results suggest …

    u-pacific Repository record for A comparative analysis of physical activity interventions for young children (opens in a new tab)

  8. Educators' Technology Level of Use and Methods for Learning Technology Integrations.

    … reason was that the method fit into their time schedule followed by the location of the training. The least given reason was that it was the best method for learning the technology skill.

    unt Repository record for Educators' Technology Level of Use and Methods for Learning Technology Integrations. (opens in a new tab)

  9. Improving Open Channel Network Operation Using Gate Control Support Model Developed with ArcGIS Geoprosessing Tools

    … flow control structures. This model presents a time schedule for gate operation based on the demands at turnouts through the water usage schedule of the network. The developed model was designed to be added as a tool to ArcToolbox in ArcGIS. Any ArcGIS user who has access to ArcView or ArcInfo …

    tdl Repository record for Improving Open Channel Network Operation Using Gate Control Support Model Developed with ArcGIS Geoprosessing Tools (opens in a new tab)

  10. The college student as mother : a phenomenological examination of community college student experiences

    … inclusion criteria: enrolled at least half-time, degree-seeking, minimum 2.5 G.P.A., Pell eligible and first-generation, had one or more children ages 0-10 living in the home. There were seven total participants in the study. Five themes emerged from the participant data: support systems, …

    ballstate-thes Repository record for The college student as mother : a phenomenological examination of community college student experiences (opens in a new tab)

  11. Impact of Public Transport System on the Academic Performance of Primary School Students in Dar es Salaam

    … examine the impact of public transport irregular schedule on the academic performance of primary school students, and to examine coping strategies that are used by primary school students to deal with challenging public transport system in the city of Dar es Salaam. The study was carried out in …

    ou-tanzania Repository record for Impact of Public Transport System on the Academic Performance of Primary School Students in Dar es Salaam (opens in a new tab)

  12. A Workshop Plan for Food Service Supervisors in Seventh-day Adventist Institutions in Mexico

    … of these topics were developed and a tentative time schedule for the workshop was formulated.</p> <p>In the workshop plan provision was made for active member participation through group discussion and interchange of ideas. Activities such as demonstrations, field trip, and laboratory experience …

    loma-linda Repository record for A Workshop Plan for Food Service Supervisors in Seventh-day Adventist Institutions in Mexico (opens in a new tab)

  13. Reentry adjustment of short-term student sojourners: A test of the U-curve hypothesis

    … for sojourner reentry adjustment by using a time series design with 6 biweekly time waves during reentry. Study abroad students (n = 62) returned to their US homes and then to college after 3 months overseas. A US-based control group (n = 21) returned to college on the same time schedule. …

    uiuc Repository record for Reentry adjustment of short-term student sojourners: A test of the U-curve hypothesis (opens in a new tab)

  14. Risk based decision making for the deferment of U.S. Navy submarine maintenance

    … the maintenance community has begun to invest time and resources in these larger, systemic issues. This thesis investigates the impacts of deferred maintenance actions on the timely completion of submarine maintenance periods by analyzing data from 50 refits executed over a decade at Trident …

    mit Repository record for Risk based decision making for the deferment of U.S. Navy submarine maintenance (opens in a new tab)

  15. The Role of Glutamate in the Medial Prefrontal Cortex in the Acquistion and Expression of Conditioned Approach

    … and food pellets (US) presented under a random time schedule. After a two-day break, rats underwent a session with no CS or US and a CS-only (extinction) test session on the following day. For the acquisition of conditioned approach, NMDA receptors were blocked with AP5 prior to each of the …

    cuny-grad Repository record for The Role of Glutamate in the Medial Prefrontal Cortex in the Acquistion and Expression of Conditioned Approach (opens in a new tab)

  16. Photoelastic analysis of thermal stresses

    … The thermocouples here, are for the first time, mounted outside the sandwiched polariscope in a separate sensor block where they do not disturb the photoelastic fringe pattern of the thermally induced stresses. The stress fringe patterns are observed continuously and photographed according …

    cape-town Repository record for Photoelastic analysis of thermal stresses (opens in a new tab)

  17. Development of an intelligent tool for energy efficient and low environment impact shipping

    … was first developed for determining the minimum time of a voyage. However, after 90's, driven by the increasing oil price and the environmental considerations, most shipping companies have began to show more and more interest in minimising fuel consumption in a route, in the meantime, maintaining …

    strathclyde Repository record for Development of an intelligent tool for energy efficient and low environment impact shipping (opens in a new tab)

  18. Development of a ship weather routing system towards energy efficient shipping

    … results in every waypoint which cannot meet the time schedule, set the speed control parameter, delete results in every waypoint which cannot meet expected fuel consumption and optimise programming codes. With these methods introduced, the structure and operation logic of the system also becomes …

    strathclyde Repository record for Development of a ship weather routing system towards energy efficient shipping (opens in a new tab)

  19. Job shop scheduling to minimize work-in-process, earliness and tardiness costs

    … from different customers. A good production schedule is required to complete the orders on time with the limited resources and minimize the relevant costs. Such a scenario is modelled as a job shop problem with non-regular performance measure (shorted as JIT-JSP). The objective of JIT-JSP is …

    nus Repository record for Job shop scheduling to minimize work-in-process, earliness and tardiness costs (opens in a new tab)

  20. Tinggi tempat (markaz) sebagai pertimbangan menghitung masuknya waktu maghrib (ifthâr) di bulan Ramadhan untuk daerah Malang: Studi atas jadwal imsakiyah Fakultas Syariah UIN Maliki Malang

    … ibadah sholat dan Puasa. ENGLISH: During this time schedule the Maghrib (Ifthâr) in the month of Ramadan (Imsakiyah) which is published by the Faculty of Shariah UIN Maliki Malang does not use the high of places (markaz). The high of places (markaz) becomes a factor to calculate the accuracy of …

    malang Repository record for Tinggi tempat (markaz) sebagai pertimbangan menghitung masuknya waktu maghrib (ifthâr) di bulan Ramadhan untuk daerah Malang: Studi atas jadwal imsakiyah Fakultas Syariah UIN Maliki Malang (opens in a new tab)

Page 1 of 2