Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 1 of 1 for “"rough mill simulator"”.

  1. Integrating the Least-Cost Grade-Mix Solver into ROMI

    Up to 70 percent of rough mill manufacturing expenses stem from raw material (lumber) cost. Rough mill costs can be reduced by optimizing the lumber grade or grades that are purchased. This solution is known as the least-cost lumber grade-mix solution. The least-cost lumber grade-mix solutions has …

    vt Repository record for Integrating the Least-Cost Grade-Mix Solver into ROMI (opens in a new tab)