Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 5 of 5 for “"risk based inspection"”.
-
Decision support system for risk-based inspection and maintenance planning for ship hull structures
… aims to develop a decision support system for inspection and maintenance planning of ship hull structures considering the effects of repair activities performed during the different periodical inspection events through the service life of a ship. Because of the severe environmental conditions …
-
Development of an approach to incorporate proportional hazard modelling into a risk-based inspection methodology for an optimal inspection policy
… Therefore, industry decision makers rely on a risk-based approach to perform inspection and maintenance on the pressure vessel. According to the Risk-Based Inspection and Maintenance Procedures project (RIMAP) for the European industry, risk has two main components: the probability of failure …
-
A contribution to risk-informed inspection and maintenance planning for unpiggable pipelines subject to internal corrosion
… a major cause of failure for energy pipelines. Inspection and repair strategies are implemented to avoid pipeline failures and their consequences. In-line inspection is the most detailed examination technique for pipelines, but almost half of existing pipelines are unpiggable and cannot be …
-
Risk and reliability-based maintenance for highway infrastructure asset management
… After that quantitative techniques such as risk-based inspection, reliability growth analysis, Markov Chain deterioration modelling and treatment renewal costing were piloted using real-time UK highway maintenance data sets from Network Maintenance Management System (NMMS) and highway …
-
Optimising Turnaround Maintenance (TAM) Scheduling of Gas plants in Libya
… of Equipment (CSEs) that constitute the highest risk based on Risk-Based Inspection (RBI). Third stage; selecting Critical Rotating pieces of Equipment (CREs) that constitute the highest risk based on Risk-Based Failure (RBF). Fourth stage; defining the optimum duration and interval of TAM based …