Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 2 of 2 for “"quantity takeoff"”.

  1. Comparing Time and Accuracy of Building Information Modeling to On-Screen Takeoff for a Quantity Takeoff of a Conceptual Estimate

    … The most tedious component of an estimate is the quantity takeoff. Different tools are available to improve an estimator's productivity for a quantity takeoff. Faster quantity takeoffs enable estimator to bid more jobs. This study analyzed the time and accuracy of performing quantity takeoffs when …

    byu Repository record for Comparing Time and Accuracy of Building Information Modeling to On-Screen Takeoff for a Quantity Takeoff of a Conceptual Estimate (opens in a new tab)

  2. A quantitative methodology for mapping project costs to engineering decisions in naval ship design and procurement

    … is not enough detail to allow for a traditional quantity takeoff estimate to be performed. Much of the budgeting process takes place during the early stages of a design and it is important to be able to develop a budget quality estimate so a design is allocated the necessary resources to meet …

    mit Repository record for A quantitative methodology for mapping project costs to engineering decisions in naval ship design and procurement (opens in a new tab)