Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 4 of 4 for “"delay claims"”.

  1. Documentation requirements for contractor pursuit of delay claims

    Thesis (M.S.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, 1995.

    mit Repository record for Documentation requirements for contractor pursuit of delay claims (opens in a new tab)

  2. Apportioning liability in construction delay claims : an evaluation of contemporary practices in the U.A.E. and a proposal for improvements

    … for apportioning liabilities inconstruction delay claims. Yet, there is no much consensus among the practitionerstowards them. Often, the implementation of these theories, concepts and methodologies ina project is based on Decision Makers' (DMs) individual judgments. Individualjudgments are …

    salford Repository record for Apportioning liability in construction delay claims : an evaluation of contemporary practices in the U.A.E. and a proposal for improvements (opens in a new tab)

  3. Delay-caused claims in infrastructure projects under design-bid-build delivery systems

    Delay-caused claims lead to cost overruns in infrastructure projects due to the cost of construction time and impacts on related services. The purpose of this study was to evaluate the causes and effects of these claims on road and bridge projects and to create an effective claims management …

    colostate Repository record for Delay-caused claims in infrastructure projects under design-bid-build delivery systems (opens in a new tab)

  4. Bookkeeping Procedures for the Application of the Concept of Pre-Allocation of Total Float

    … project, even the slightest change can result in delays. As per the current scheduling practices, float is considered free. It is an expiring resource and hence the party to the use the float first owns the float. The concept endorsed by the court for analyzing delay claims is the proximate cause …

    vt Repository record for Bookkeeping Procedures for the Application of the Concept of Pre-Allocation of Total Float (opens in a new tab)